Estimating power plant start costs in cyclic operation

被引:59
|
作者
Keatley, P. [1 ]
Shibli, A. [2 ]
Hewitt, N. J. [1 ]
机构
[1] Univ Ulster, Ctr Sustainable Technol, Newtownabbey BT37 0QB, North Ireland
[2] European Technol Dev, Leatherhead KT22 7LX, Surrey, England
关键词
Power plant cycling; Renewable energy integration planning; Power plant operations and maintenance costs; SYSTEM;
D O I
10.1016/j.apenergy.2013.05.033
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In many power systems large thermal generating units, which were primarily designed to resist creep damage caused by base load operation throughout an effective service life of more than 40 years, are being operated cyclically as a result of market liberalization and the rapid expansion of intermittent renewable energy sources. This type of off-design operation results in accelerated rates of life consumption due to the initiation of fatigue-related damage mechanisms which these units were not designed to withstand. This issue is of particular concern to the owners and operators of thermal generators in the Irish all-island system because of the significantly increased levels of cycling duty that their units will be required to perform as a result of plans to integrate very high levels of wind power by 2020. The impacts of cyclic operation on unit operating costs, scheduling and availability has largely been overlooked in renewable energy integration studies. The authors draw on the results of recent studies in Ireland and elsewhere to relate fatigue-life consumption (measured in total lifetime starts) and damage accumulation (measured in annual maintenance costs) to create a model which can be used to forecast lifetime hot, warm and cold per-start costs for a typical base load unit in a range of market and wind-penetration scenarios. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:550 / 557
页数:8
相关论文
共 50 条
  • [1] ESTIMATING OPERATION COSTS OF A WASTEWATER TREATMENT-PLANT
    JOLY, Y
    EAU DU QUEBEC, 1983, 16 (01): : 81 - &
  • [2] ESTIMATING SEWAGE TREATMENT PLANT OPERATION AND MAINTENANCE COSTS
    ROWAN, PP
    JENKINS, KL
    HOWELLS, DH
    JOURNAL WATER POLLUTION CONTROL FEDERATION, 1961, 33 (02): : 111 - 121
  • [3] MODIFYING A FOSSIL POWER-PLANT FOR CYCLIC OPERATION
    PAPROTNA, LA
    CUNHA, J
    POWER ENGINEERING, 1989, 93 (08) : 31 - 33
  • [4] Specific Intensity of Physiological Costs during Cyclic Operation of Different Power
    Kozlov A.V.
    Vavaev A.V.
    Yakushkin A.V.
    Laptev A.I.
    Yurikov R.V.
    Sonkin V.D.
    Human Physiology, 2022, 48 (1) : 13 - 19
  • [5] Performance of a Hydro Power Plant During Black Start and Islanded Operation
    Kurup, Sreeram R.
    Ashok, S.
    2015 IEEE INTERNATIONAL CONFERENCE ON SIGNAL PROCESSING, INFORMATICS, COMMUNICATION AND ENERGY SYSTEMS (SPICES), 2015,
  • [6] Estimating plant construction costs
    Pintelon, L
    VanPuyvelde, F
    CHEMICAL ENGINEERING, 1997, 104 (08) : 98 - &
  • [7] POWER GENERATING UNITS START-UP PROCESS ASSESSMENT WITH THE RESPECT TO OPERATION COSTS
    Kosman, Gerard
    RYNEK ENERGII, 2008, (06): : 27 - 33
  • [9] PREDESIGN ESTIMATING OF PLANT CAPITAL COSTS
    WARD, TJ
    CHEMICAL ENGINEERING, 1984, 91 (19) : 121 - &
  • [10] ESTIMATING PLANT COSTS IN DEVELOPING COUNTRIES
    YEN, YC
    CHEMICAL ENGINEERING, 1972, 79 (15) : 89 - &