All in the timing

被引:0
|
作者
Paterson, S
机构
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The purpose of this paper is to demonstrate a method of delaying and loading a shot. Since entering the construction industry, I have learned that cover is needed on a lot of blasts. When in close having to cover shots was new to me and it seemed time consuming and wasteful. Until I really needed it and didn't have it. So What To Do??? Remember that safety comes first, if you have concerns cover it. Even if you have to sit on your shot all night to wait for cover. This method is not a replacement for cover, but it will help keen your rock down. Do not bet your life, others lives or your career on it.
引用
收藏
页码:333 / 347
页数:15
相关论文
共 50 条