Field evaluation of late merge traffic control in work zones

被引:10
|
作者
Beacher, AG
Fontaine, MD
Garber, NJ
机构
[1] Kimley Horn & Associates Inc, Herndon, VA 20171 USA
[2] Virginia Transportat Res Council, Charlottesville, VA 22903 USA
[3] Univ Virginia, Charlottesville, VA 22904 USA
来源
MAINTENANCE MANAGEMENT AND OPERATIONS SERVICES | 2005年 / 1911期
关键词
D O I
10.1177/0361198105191100104
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The traffic control strategy of the late merge in work zones was devised to improve flow and safety at work zone lane closures. Although some states have put the strategy into practice, only a handful of short-term field studies have formally evaluated its effectiveness. Additional field studies were necessary to assess the efficacy of the strategy and its proper deployment. This paper documents the results of a field test of the late merge traffic control conducted over several months. The late merge strategy was evaluated by comparing its effectiveness with that of traditional plans for work zone lane closures. The field test was conducted on a primary route in Tappahannock, Virginia, at a two-to-one lane closure. Results showed that throughput increased, but the increase was not statistically significant. Likewise, time in queue decreased, but the decrease was not statistically significant. These results were much less dramatic than those of other studies. Possible reasons for this disparity include different driver populations, road types, vehicle mixes, and site-specific characteristics. Despite limited improvements in throughput and time in queue, more drivers were in the closed lane, a positive response to the late merge signs.
引用
收藏
页码:33 / 41
页数:9
相关论文
共 50 条
  • [1] Guidelines for using late merge traffic control in work zones - Results of a simulation-based study
    Beacher, AG
    Fontaine, MD
    Garber, NJ
    MAINTENANCE MANAGEMENT AND OPERATIONS SERVICES, 2005, (1911): : 42 - 50
  • [2] Dynamic late merge control at highway work zones - Evaluations, observations, and suggestions
    Kang, Kyeono-Pyo
    Chang, Gang-Len
    Paracha, Jawad
    MANAGEMENT AND DELIVERY OF MAINTENANCE AND OPERATIONS SERVICES, 2006, (1948): : 86 - 95
  • [3] Dymamic late merge-control concept for work zones on rural interstate highways
    McCoy, PT
    Pesti, G
    TRANSPORTATION WORK-ZONE SAFETY AND WINTER SERVICES: MAINTENANCE, 2001, (1745): : 20 - 26
  • [4] Dynamic Late Lane Merge System at Freeway Construction Work Zones
    Grillo, Lia F.
    Datta, Tapan K.
    Hartner, Catherine
    TRANSPORTATION RESEARCH RECORD, 2008, (2055) : 3 - 10
  • [5] Evaluation of portable traffic signals at work zones
    Ullman, Gerald L.
    Levine, Steven Z.
    Transportation Research Record, 1987, (1148) : 30 - 33
  • [6] Study on intelligent lane merge control system for freeway work zones
    Pei Yulong
    Dai Leilei
    2007 IEEE INTELLIGENT TRANSPORTATION SYSTEMS CONFERENCE, VOLS 1 AND 2, 2007, : 903 - 908
  • [7] EXPERT SYSTEM FOR TRAFFIC CONTROL IN WORK ZONES
    FAGHRI, A
    DEMETSKY, MJ
    JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1990, 116 (06): : 759 - 769
  • [8] Safety impacts of signalized lane merge control at highway work zones
    Qi, Yi
    Zhao, Qun
    TRANSPORTATION PLANNING AND TECHNOLOGY, 2017, 40 (05) : 577 - 591
  • [9] Safety Evaluation of Joint and Conventional Lane Merge Configurations for Freeway Work Zones
    Ishak, Sherif
    Qi, Yan
    Rayaprolu, Pradeep
    TRAFFIC INJURY PREVENTION, 2012, 13 (02) : 199 - 208
  • [10] SYSTEM IMPROVES SAFETY AND TRAFFIC CONTROL IN WORK ZONES
    BURNHAM, AC
    PUBLIC WORKS, 1984, 115 (12): : 59 - 60