Demolition of old bridge piers byblasting

被引:0
|
作者
Mandal, SK [1 ]
Singh, MM [1 ]
Singh, RB [1 ]
机构
[1] Cent Min Res Inst, Blasting Dept, Dhanbad 826001, Bihar, India
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The demolition of structures with explosive though most rapid, safe and efficient requires planned blast design parameters with respect to geometric and strength properties of the structure to be demolished. The paper, here deals with successful demolition of three old bridge piers by different blast designs. These piers were 11 m tall and very close to the existing bridge, The plan distance of the old piers from the existing bridge varied between 4,5 m and 14,25 m. The paper also deals with the mathematical concepts for the causes of such action of demolition/dismantling of structures.
引用
收藏
页码:215 / 233
页数:19
相关论文
共 50 条
  • [1] NEW PIERS FOR AN OLD BRIDGE
    WHITAKER, RL
    SNYDER, HP
    CIVIL ENGINEERING, 1989, 59 (02): : 64 - 66
  • [2] Safety and Stability Analysis of Demolition and Reconstruction of Existing Railway Bridge Piers and Caps
    Pan, Pengxu
    Chen, Wei
    Wu, Pei
    APPLIED SCIENCES-BASEL, 2023, 13 (12):
  • [3] Bearing Capacity of Old Masonry Bridge Piers.
    Leonhardt, F.
    Bauingenieur Berlin, 1983, 58 (12): : 447 - 451
  • [4] UNDERPINNING OF THE SCOURED PIERS OF THE OLD BRIDGE OF ARTA, GREECE
    VETTAS, PN
    ENGINEERING GEOLOGY OF ANCIENT WORKS, MONUMENTS AND HISTORICAL SITES : PRESERVATION AND PROTECTION, VOL 1, 1988, : 343 - 350
  • [5] Demolition of the old bridge over the Rhine in Wiesbaden-Schierstein
    Springer, Johannes
    Juenger, Ulrich
    Kina, Sven
    STAHLBAU, 2019, 88 (08) : 744 - 752
  • [6] Demolition of Refinery Interchange Bridge B4247: Condition of a 58-Year Old Prestressed Concrete Bridge After Demolition
    van Breda, Kinte
    Olivier, Wandie
    Faure, Anton
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON CONCRETE REPAIR, REHABILITATION AND RETROFITTING, ICCRRR 2024, 2025, 59 : 76 - 87
  • [7] Demolition of Old Oak Bridge B4113: Condition of a 54-year old prestressed concrete bridge
    Kramer, Wandie
    Martin, William
    Viljoen, Harry
    INTERNATIONAL CONFERENCE ON CONCRETE REPAIR, REHABILITATION AND RETROFITTING (ICCRRR 2018), 2018, 199
  • [8] Riprap at bridge piers
    Duarte, CA
    Sáinz, JA
    JOURNAL OF HYDRAULIC RESEARCH, 1999, 37 (03) : 291 - 302
  • [9] Foundation Depth for Bridge Piers
    Veerappadevaru G.
    Gangadharaiah T.
    Jagadeesh T.R.
    Journal of The Institution of Engineers (India): Series A, 2013, 94 (03) : 169 - 177
  • [10] Vehicle Collision with Bridge Piers
    El-Tawil, Sherif
    Severino, Edward
    Fonseca, Priscilla
    JOURNAL OF BRIDGE ENGINEERING, 2005, 10 (03) : 345 - 353