Symbolic construction of GR(1) contracts for systems with full information

被引:0
|
作者
Filippidis, Ioannis [1 ]
Murray, Richard M. [1 ]
机构
[1] CALTECH, Control & Dynam Syst, Pasadena, CA 91125 USA
关键词
TEMPORAL LOGIC;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This work proposes a symbolic algorithm for the construction of assume-guarantee specifications that allow multiple agents to cooperate. Each agent is assigned goals expressed in a fragment of linear temporal logic known as generalized Streett with one pair, GR(1). These goals may be unrealizable, unless each agent makes additional assumptions, about the behavior of other agents. The algorithm constructs a contract among the agents, in that only the infinite behavior of the given goals is constrained, known as liveness, not the finite one, known as safety. This defers synthesis to a later stage of refinement, modularizing the design process. We prove that there exist GR(1) games that do not admit any refining GR(1) contract. For this reason, we formulate contracts with nested GR(1) properties and auxiliary communication variables, and prove that they always exist. The algorithm's fixpoint structure is similar to GR(1) synthesis, enjoying time complexity polynomial in the number of states, and linear in number of recurrence goals.
引用
收藏
页码:782 / 789
页数:8
相关论文
共 50 条
  • [1] Symbolic Repairs for GR(1) Specifications
    Maoz, Shahar
    Ringert, Jan Oliver
    Shalom, Rafi
    2019 IEEE/ACM 41ST INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING (ICSE 2019), 2019, : 1016 - 1026
  • [2] Information, semiotics, and symbolic systems
    Auletta, Gennaro
    SEMIOTICA, 2007, 166 (1-4) : 359 - 376
  • [3] INFORMATION-SYSTEM FOR CONSTRUCTION CONTRACTS AND MANAGEMENT
    ANTANAVICHIUS, K
    MANAGING CONSTRUCTION WORLDWIDE, VOL 1: SYSTEMS FOR MANAGING CONSTRUCTION, 1987, : 408 - 414
  • [4] The application of Information Management in Construction Contracts Management
    Liu, Hua
    Zhao, Chunqiao
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INFORMATION SCIENCE AND COMPUTER APPLICATIONS (ICSA 2013), 2013, 92 : 311 - 315
  • [5] Information system for construction contracts structural analysis
    Trinkuniene, Eva
    Trinkunas, Vaidotas
    2ND INTERNATIONAL SCIENTIFIC CONFERENCE - CONTEMPORARY ISSUES IN BUSINESS, MANAGEMENT AND EDUCATION 2013, 2014, 110 : 1226 - 1234
  • [6] Longitudinal Study of Information Management in University Construction Contracts
    Celoza, Amelia
    de Oliveira, Daniel P.
    Leite, Fernando
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 69 - 78
  • [7] A symbolic approach using feature construction capable of acquiring information/knowledge for building expert systems
    Major, RL
    INFORMATION PROCESSING & MANAGEMENT, 1998, 34 (2-3) : 291 - 308
  • [8] Construction of symbolic representation from human motion information
    Araki, Yutaka
    Arita, Daisaku
    Taniguchi, Rin-ichiro
    Uchida, Seiichi
    Kurazume, Ryo
    Hasegawa, Tsutomu
    KNOWLEDGE-BASED INTELLIGENT INFORMATION AND ENGINEERING SYSTEMS, PT 2, PROCEEDINGS, 2006, 4252 : 212 - 219
  • [9] Information systems contracts and relationships: A Spanish perspective
    Gonzalez, Reyes
    Gasco, Jose
    Llopis, Juan
    JOURNAL OF BUSINESS RESEARCH, 2016, 69 (05) : 1696 - 1700
  • [10] Seismic refraction in relation to geotechnical information for (road) construction contracts
    Stewart, IE
    Williams, JR
    Walker, CS
    MODERN GEOPHYSICS IN ENGINEERING GEOLOGY, 1997, (12): : 383 - 390