Construction of the BHP Ekati Diamond Mine, located about 300 km northeast of Yellowknife, is now nearing completion. Construction commenced in January 1997 and the ore processing plant is scheduled-to be commissioned in October 1998. BHP is committed to achieving excellence in environmental management,throughout all phases of project operation as reflected in the company's corporate-wide Environmental Policy. BHP's approach to environmental management is consistent with the key elements of ISO: 14001 and seeks continuous improvement in performance by taking:account of evolving scientific knowledge, project experience and community expectations. The primary goal bf BHP's environmental management plan is to protect and preserve ecosystem integrity as well as to prevent and mitigate potential environmental impacts associated with the project. This paper serves to describe BHP's approach to environmental management at the Ekati Mine and its evolution from the pre-construction phase to the imminent operational and long-term reclamation phases.
引用
收藏
页码:63 / 70
页数:8
相关论文
共 50 条
  • [1] Regulatory approval process for BHP's Ekati Diamond Mine, Northwest Territories, Canada
    Witteman, J
    Davis, LM
    Hanks, C
    MINING IN THE ARCTIC, 1999, : 7 - 11
  • [2] Challenges of construction in the Arctic: The Ekati Diamond Mine
    McKenzie, WC
    Meisl, JG
    Russenholt, WC
    Stocki, R
    MINING IN THE ARCTIC, 1999, : 79 - 84
  • [3] Evolution of blasting practices at the Ekati™ Diamond Mine
    Tannant, DD
    Peterson, J
    PROCEEDINGS OF THE SEVENTEENTH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, 2001, : 297 - 304
  • [4] Wall control blasting practices at the Ekati™ diamond mine
    Peterson, J
    Tannant, DD
    Todd, J
    CIM BULLETIN, 2001, 94 (1050): : 67 - 73
  • [5] A technique for identifying structural domain boundaries at the EKATI Diamond Mine
    Martin, MW
    Tannant, DD
    ENGINEERING GEOLOGY, 2004, 74 (3-4) : 247 - 264
  • [6] Effective resource estimates for primary diamond deposits from the EKATI diamond mine™, Canada
    Dyck, DR
    Oshust, PA
    Carlson, JA
    Nowicki, TE
    Mullins, MP
    LITHOS, 2004, 76 (1-4) : 317 - 335
  • [7] The geology and emplacement history of the Pigeon kimberlite, EKATI Diamond Mine, Northwest Territories, Canada
    Crawford, Barbara
    Hetman, Casey
    Nowicki, Tom
    Baumgartner, Mike
    Harrison, Sara
    LITHOS, 2009, 112 : 501 - 512
  • [9] Stochastic simulation of the Fox kimberlitic diamond pipe, Ekati mine, Northwest Territories, Canada
    Robles-Stefoni, L.
    Dimitrakopoulos, R.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2016, 116 (02) : 189 - 200
  • [10] The influence of volcanological and sedimentological processes on diamond grade distribution in kimberlites: examples from the EKATI Diamond Mine, NWT, Canada
    Lucy A. Porritt
    R. A. F. Cas
    L. Ailleres
    P. Oshust
    Bulletin of Volcanology, 2011, 73 : 1085 - 1105