Optimization of the transition from open-pit to underground operation in combined mining using (0-1) integer programming

被引:1
|
作者
Bakhtavar, E. [1 ]
Shahriar, K. [2 ]
Mirhassani, A. [3 ]
机构
[1] Urmia Univ Tech, Dept Min & Met Engn, Orumiyeh, Iran
[2] Amirkabir Univ Technol, Dept Min & Met Engn, Tehran, Iran
[3] Amirkabir Univ Technol, Dept Math & Comp Sci, Tehran, Iran
关键词
open-pit; underground; transition depth; optimization; (0-1) integer programming; combined mining;
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
There are many near-surface deposits with considerable vertical extent that have the potential to be mined by a combined method of open-pit and underground methods. In this regard, there is often a point called 'transition depth' where a decision has to be made whether to continue deepening the pit or change to underground methods. Recently, optimization of the transition from open-pit to underground operation has become an important challenge in mining engineering. Optimally, to model the transition problem on the basis of maximization of the profit from open-pit and underground mining, (0-1) integer programming has been used. In this method, block economic values of open-pit and underground methods should be imported to the transition model. A hypothetical example is presented in order to assess the model in detail.
引用
收藏
页码:1059 / 1064
页数:6
相关论文
共 50 条
  • [1] Where to make the transition from open-pit to underground? Using integer programming
    Chung, J.
    Topal, E.
    Ghosh, A. K.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2016, 116 (08) : 798 - 808
  • [2] Transition from open-pit to underground as a new optimization challenge in mining engineering
    E. Bakhtavar
    K. Shahriar
    K. Oraee
    Journal of Mining Science, 2009, 45 : 485 - 494
  • [3] Optimization of transition from open-pit to underground mining considering environmental costs
    Badakhshan N.
    Shahriar K.
    Afraei S.
    Bakhtavar E.
    Resources Policy, 2024, 95
  • [4] Transition from open-pit to underground as a new optimization challenge in mining engineering
    Bakhtavar, E.
    Shahriar, K.
    Oraee, K.
    JOURNAL OF MINING SCIENCE, 2009, 45 (05) : 485 - 494
  • [5] Optimal mining model of transition from open-pit to underground mining
    Wang, Xin-Min
    Zhao, Jian-Wen
    Zhang, Qin-Li
    Wu, Peng
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2012, 43 (04): : 1434 - 1439
  • [6] The Study on Optimization of Treatment Plan for Slope in a Transition from Open-pit to Underground Mining
    Sun, Shi Guo
    Zhang, Jian Yi
    Liu, Yu
    Miao, Ai Wei
    MANUFACTURING, DESIGN SCIENCE AND INFORMATION ENGINEERING, VOLS I AND II, 2015, : 452 - 457
  • [7] MINING METHOD SELECTION AND OPTIMIZATION OF TRANSITION FROM OPEN PIT TO UNDERGROUND IN COMBINED MINING
    Bakhtavar, Ezzeddin
    Shahriar, Kourosh
    Oraee, Kazem
    ARCHIVES OF MINING SCIENCES, 2009, 54 (03) : 481 - 493
  • [8] Combined optimisation of an open-pit mine outline and the transition depth to underground mining
    Whittle, D.
    Brazil, M.
    Grossman, P. A.
    Rubinstein, J. H.
    Thomas, D. A.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 268 (02) : 624 - 634
  • [9] Timing of transition from open-pit to underground mining: A simultaneous optimisation model for open-pit and underground mine production schedules
    Chung, Joyce
    Asad, Mohammad Waqar Ali
    Topal, Erkan
    RESOURCES POLICY, 2022, 77
  • [10] EXPERIENCE IN ORE RESERVES EXTRACTION IN OPEN-PIT BORDERS AND BOTTOM IN TRANSITION FROM OPEN-PIT TO UNDERGROUND MINING
    Tankov, M. S.
    Shelkovy, I. S.
    JOURNAL OF MINING INSTITUTE, 2012, 198 : 37 - 42