Fuzzy-Based Life-Cycle Cost Model for Decision Making under Subjectivity

被引:58
|
作者
Ammar, Mohammad [1 ]
Zayed, Tarek [2 ]
Moselhi, Osama [2 ]
机构
[1] Tanta Univ, Fac Engn, Dept Struct Engn, Tanta 31521, Egypt
[2] Concordia Univ, BCEE Dept, Montreal, PQ H3G 1M8, Canada
关键词
Decision making; Ranking of alternatives; Life-cycle cost; Uncertainty; Subjectivity; Fuzzy set theory;
D O I
10.1061/(ASCE)CO.1943-7862.0000576
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Decision support models are needed to facilitate long-term planning and priority setting among competing alternatives. Life-cycle cost is the most frequently used economic model that considers all cost elements and related factors throughout the service life of the alternatives being considered. These cost elements and related factors are usually associated with uncertainty and subjectivity. As such, it is important to model the uncertainty arising from the assumed data over the service life of competing alternatives. Probabilistic techniques, such as Monte Carlo simulation, are commonly used to deal with such uncertainty or vagueness. However, they have been criticized for their complexity and amount of data required. This paper presents a fuzzy-based life-cycle cost model that accounts for uncertainty in a manner that disadvantages commonly encountered in probabilistic models are alleviated. The developed model utilized fuzzy set theory and interval mathematics to model vague, imprecise, qualitative, linguistic, and/or incomplete data. The model incorporates the equivalent annual cost method along with the Day-Stout-Warren (DSW) algorithm and the vertex method to evaluate competing alternatives. An example application is presented in order to demonstrate the use of the developed model and to illustrate its essential features. DOI: 10.1061/(ASCE)CO.1943-7862.0000576. (C) 2013 American Society of Civil Engineers.
引用
收藏
页码:556 / 563
页数:8
相关论文
共 50 条
  • [1] Life-cycle cost analysis as a tool for decision making
    Val, DV
    Stewart, MG
    APPLICATIONS OF STATISTICS AND PROBABILITY IN CIVIL ENGINEERING, VOLS 1 AND 2, 2003, : 757 - 764
  • [2] Research on the Project Decision-making Method Based on the Construction Life-cycle Cost
    Dong, Jin
    Wei, Fajie
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT ENGINEERING AND INFORMATION TECHNOLOGY, VOLS 1 AND 2, 2009, : 512 - 516
  • [3] Integrated life-cycle costs analysis and life-cycle assessment model for decision making of construction project
    Gu Yu-rong
    Chang Yuan
    Liu Yi-qun
    2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 448 - +
  • [4] Planning decision based on life-cycle cost for deteriorating bridges
    Hunan University, Changsha 410082, China
    不详
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2008, 41 (10): : 45 - 52
  • [5] Bridge life-cycle performance and cost: Analysis, prediction, optimization and decision making
    Frangopol, Dan M.
    Sabatino, Samantha
    Dong, You
    MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 3 - 20
  • [6] Fuzzy Multicriteria Decision-Making Approach for Pavement Project Evaluation Using Life-Cycle Cost/Performance Analysis
    Heravi, Gholamreza
    Esmaeeli, Asghar Nezhadpour
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2014, 20 (02)
  • [7] Multi-hazard upgrade decision making for critical infrastructure based on life-cycle cost criteria
    Jalayer, F.
    Asprone, D.
    Prota, A.
    Manfredi, G.
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2011, 40 (10): : 1163 - 1179
  • [8] Facility life-cycle cost analysis based on fuzzy sets theory
    Sobanjo, JO
    DURABILITY OF BUILDING MATERIALS AND COMPONENTS 8, VOLS 1-4, PROCEEDINGS, 1999, : 1798 - 1809
  • [9] LIFE-CYCLE COST - A MODEL AND APPLICATIONS
    HEDGE, GG
    IIE TRANSACTIONS, 1994, 26 (06) : 56 - 62
  • [10] Bridge life-cycle performance and cost: analysis, prediction, optimisation and decision-making
    Frangopol, Dan M.
    Dong, You
    Sabatino, Samantha
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2017, 13 (10) : 1239 - 1257