共 10 条
- [8] Application Of Limit Equilibrium Method To Stability Analysis Of Jinping I High Arch Dam Abutment On 3d Multi-Grid Method PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 499 - +
- [9] Research on power grid fault diagnosis based on model matching and AI correction method with multi-dimensional data 2018 2ND IEEE CONFERENCE ON ENERGY INTERNET AND ENERGY SYSTEM INTEGRATION (EI2), 2018,