Automated process planning system: A new method for setup planning and a mathematical model for fixture design

被引:10
|
作者
Abedini, Vahid [1 ]
Shakeri, Mohsen [1 ]
Siahmargouei, Mohammad Hasan [1 ]
Baseri, Hamid [1 ]
机构
[1] Babol Noshirvani Univ Technol, Fac Mech Engn, Babol Sar 471487116, Mazandaran, Iran
关键词
Setup planning; fixture design; prismatic components; position tolerance; hole making; GRAPH APPROACH; OPTIMIZATION; CAPP;
D O I
10.1177/0954405413492731
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Setup planning and fixture design are two main tasks for the integration of design and manufacturing process. Setup planning identifies which features must be machined in each setup and determines locating datum for each setup, whereas fixture planning determines precise locating and rigid clamping of workpieces according to a part design and process requirements. So, a close interaction exists between setup planning and fixture design. This research deals with the problems of setup and fixture planning for the machining of prismatic parts. In the first step, a new heuristic method is presented to plan the setups with accurate respect to datum faces in design and manufacturing. Two concepts, namely, inferiority face and control face, have been used for this purpose. In the next step, a mathematical model is used to define the primary, secondary and tertiary fixture planes with respect to locators' position. This model determines relationship between misplacement of locators and dimensional and geometrical specifications of workpiece. The main purpose of developing the model is to determine the effect of locator height error on hole position tolerance. The capability of this model is verified by simulation in motion study module in SolidWorks software. This approach is very useful in the hole-making process. The system is developed in Visual Basic on a SolidWorks platform. The effectiveness of the system is verified by an industrial component.
引用
收藏
页码:1849 / 1859
页数:11
相关论文
共 50 条
  • [1] Setup and fixture planning in automated process planning systems
    Joneja, Ajay
    Chang, Tien-Chien
    IIE Transactions (Institute of Industrial Engineers), 1999, 31 (07): : 653 - 665
  • [2] Setup and fixture planning in automated process planning systems
    Joneja, A
    Chang, TC
    IIE TRANSACTIONS, 1999, 31 (07) : 653 - 665
  • [3] Fixture and Setup Planning and Fixture Configuration System
    Attila, Retfalvi
    Stampfer, Michael
    Imre, Szegh
    FORTY SIXTH CIRP CONFERENCE ON MANUFACTURING SYSTEMS 2013, 2013, 7 : 228 - 233
  • [4] Intelligent setup generation for automated fixture planning
    Kale, MS
    Pande, SS
    FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING, 1998, 1998, : 545 - 557
  • [5] Sequencing of Setups in Automated Setup and Fixture Planning
    Wakhare, Mayur
    Sormaz, Dugan
    44TH NORTH AMERICAN MANUFACTURING RESEARCH CONFERENCE, NAMRC 44, 2016, 5 : 41 - 57
  • [6] Concurrent fixture design for automated manufacturing process planning
    Wentao Fu
    Matthew I. Campbell
    The International Journal of Advanced Manufacturing Technology, 2015, 76 : 375 - 389
  • [7] Concurrent fixture design for automated manufacturing process planning
    Fu, Wentao
    Campbell, Matthew I.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 76 (1-4): : 375 - 389
  • [8] Automated setup and fixture planning system for box-shaped parts
    Stampfer, Michael
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 45 (5-6): : 540 - 552
  • [9] Automated setup and fixture planning system for box-shaped parts
    Michael Stampfer
    The International Journal of Advanced Manufacturing Technology, 2009, 45 : 540 - 552
  • [10] Integrated setup planning and fixture design system for prismatic parts
    Natl Univ of Singapore, Singapore, Singapore
    Int J Comput Appl Technol, 3-4 (198-212):