Mining Project Standards Must Rise to a New, Consistent Level

被引:0
|
作者
Fiscor, Steve
机构
来源
E&MJ-ENGINEERING AND MINING JOURNAL | 2008年 / 209卷 / 10期
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
引用
收藏
页码:116 / 117
页数:2
相关论文
共 50 条
  • [1] Mining companies must prepare for new accounting standards
    Braunsteiner, Dean
    CANADIAN MINING JOURNAL, 2009, 130 (01) : 30 - 30
  • [2] New standards for project management
    不详
    INTERNATIONAL GAS ENGINEERING AND MANAGEMENT, 2003, 43 (04): : 46 - 46
  • [3] New York Standards Project
    Weiss, Raymond A.
    EDUCATION, 1948, 68 (08): : 479 - 483
  • [4] Setting new standards for the mining industry
    Jensen, M
    GEOSCIENCE CANADA, 1998, 25 (03) : 139 - 140
  • [5] CLINICAL LABORATORIES MUST MEET NEW HEW STANDARDS
    不详
    GERIATRICS, 1978, 33 (05) : 13 - 14
  • [6] INTERIOR RELEASES NEW STANDARDS FOR SURFACE MINING
    HOLDEN, C
    SCIENCE, 1976, 192 (4244) : 1085 - 1085
  • [8] NEW STANDARDS PROJECT NOT THE DRIVING-FORCE
    COLLINS, C
    EDUCATIONAL LEADERSHIP, 1995, 53 (02) : 108 - 108
  • [9] Genome Project Standards in a New Era of Sequencing
    Chain, P. S. G.
    Grafham, D. V.
    Fulton, R. S.
    FitzGerald, M. G.
    Hostetler, J.
    Muzny, D.
    Ali, J.
    Birren, B.
    Bruce, D. C.
    Buhay, C.
    Cole, J. R.
    Ding, Y.
    Dugan, S.
    Field, D.
    Garrity, G. M.
    Gibbs, R.
    Graves, T.
    Han, C. S.
    Harrison, S. H.
    Highlander, S.
    Hugenholtz, P.
    Khouri, H. M.
    Kodira, C. D.
    Kolker, E.
    Kyrpides, N. C.
    Lang, D.
    Lapidus, A.
    Malfatti, S. A.
    Markowitz, V.
    Metha, T.
    Nelson, K. E.
    Parkhill, J.
    Pitluck, S.
    Qin, X.
    Read, T. D.
    Schmutz, J.
    Sozhamannan, S.
    Sterk, P.
    Strausberg, R. L.
    Sutton, G.
    Thomson, N. R.
    Tiedje, J. M.
    Weinstock, G.
    Wollam, A.
    Detter, J. C.
    SCIENCE, 2009, 326 (5950) : 236 - 237
  • [10] A new view on sea level rise
    Stefan Rahmstorf
    Nature Climate Change, 2010, 1 (1004) : 44 - 45