Estimation of nitrogen removal bacteria diversity in a full-scale pseudo- and pilot-scale biobead BNR process for treating sewage

被引:0
|
作者
Kim, Mi-Hwa [1 ]
Lee, Jin [1 ]
Kim, Moonil [1 ]
Ka, Jong-Ok [2 ]
机构
[1] Hanyang Univ, Dept Civil Engn, Ansan 426791, Gyeonggi Do, South Korea
[2] Seoul Natl Univ, Coll Agr & Life Sci, Seoul 151742, South Korea
关键词
D O I
10.1016/j.jbiotec.2008.07.1419
中图分类号
Q81 [生物工程学(生物技术)]; Q93 [微生物学];
学科分类号
071005 ; 0836 ; 090102 ; 100705 ;
摘要
引用
收藏
页码:S612 / S612
页数:1
相关论文
共 50 条
  • [1] Simultaneous organic and strong nitrogen removal from sewage in a pilot-scale BNR process with food waste
    Shin, HS
    Chae, SR
    Kim, JO
    Paik, BC
    Song, YC
    Park, HS
    KORUS 2004, Vol 1, Proceedings, 2004, : 336 - 340
  • [2] Simultaneous removal of organic and strong nitrogen from sewage in a pilot-scale BNR process supplemented with food waste
    Chae, SR
    Lee, SH
    Kim, JO
    Paik, BC
    Song, YC
    Park, HS
    Shin, HS
    WATER SCIENCE AND TECHNOLOGY, 2004, 49 (5-6) : 257 - 264
  • [3] Enhancing nitrogen removal efficiency in a dyestuff wastewater treatment plant with the IFFAS process: the pilot-scale and full-scale studies
    Mao, Yanjun
    Quan, Xie
    Zhao, Huimin
    Zhang, Yaobin
    Chen, Shuo
    Liu, Tao
    WATER SCIENCE AND TECHNOLOGY, 2018, 77 (01) : 70 - 78
  • [4] Evaluation of a full-scale step feed biological nitrogen removal (BNR) treatment facility
    Fillos, J
    Carrio, LA
    Ramalingam, K
    Thomatos, S
    Gopalakrishnan, K
    Paradis, E
    PROTECTION AND RESTORATION OF THE ENVIRONMENT VI, VOLS I - III, PROCEEDINGS, 2002, : 635 - 642
  • [5] Effect of full-scale ozonation and pilot-scale granular activated carbon on the removal of biocides, antimycotics and antibiotics in a sewage treatment plant
    Ostman, Marcus
    Bjorlenius, Berndt
    Fick, Jerker
    Tysklind, Mats
    SCIENCE OF THE TOTAL ENVIRONMENT, 2019, 649 : 1117 - 1123
  • [6] Biological nitrification in a full-scale and pilot-scale iron removal drinking water treatment plant
    Lytle, Darren A.
    Sorg, Thomas J.
    Wang, Lili
    Muhlen, Christy
    Rahrig, Matthew
    French, Ken
    JOURNAL OF WATER SUPPLY RESEARCH AND TECHNOLOGY-AQUA, 2007, 56 (02): : 125 - 136
  • [7] A strategy for the addition of plant biomass to constructed wetlands to increase nitrogen removal in treating sewage: A full-scale experiment
    Li, Qiming
    Tian, Hangfei
    Li, Chenyang
    Cao, Xuecheng
    Duan, Xiuting
    Gu, Yumei
    Yu, Qi
    Lu, Qianqian
    Zhou, Shenyan
    An, Shuqing
    Zhao, Dehua
    JOURNAL OF CLEANER PRODUCTION, 2024, 471
  • [8] Pilot-scale and full-scale evaluation of the chlorine-ammonia process for bromate control during ozonation
    Wert, Eric C.
    Neemann, Jeffrey J.
    Johnson, David
    Rexing, David
    Zegers, Ronald
    OZONE-SCIENCE & ENGINEERING, 2007, 29 (05) : 363 - 372
  • [9] Sudden failure of biological nitrogen and carbon removal in the full-scale pre-denitrification process treating cokes wastewater
    Kim, Young Mo
    Park, Donghee
    Lee, Dae Sung
    Jung, Kyung A.
    Park, Jong Moon
    BIORESOURCE TECHNOLOGY, 2009, 100 (19) : 4340 - 4347
  • [10] Pilot-Scale Polyhydroxyalkanoate Production from Paper Mill Wastewater: Process Characteristics and Identification of Bottlenecks for Full-Scale Implementation
    Tamis, Jelmer
    Mulders, Michel
    Dijkman, Henk
    Rozendal, Rene
    van Loosdrecht, Mark. C. M.
    Kleerebezem, Robbert
    JOURNAL OF ENVIRONMENTAL ENGINEERING, 2018, 144 (10)