Optimizing Production Line Balance Based on Witness Simulation

被引:0
|
作者
Xiao, Fulong [1 ]
Shao, Liping [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Econ & Management, Beijing, Peoples R China
来源
2018 8TH INTERNATIONAL CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCES (LISS) | 2018年
关键词
industrial engineering; process analysis; witness simulation; production line balance;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Based on the current LCD (Liquid Crystal Display) module production line type S-S00A(SEL315V3-S00A), this paper studies the production line of liquid-crystal module with the method of industrial engineering and simulation method. Firstly, the process of the production line of the liquid crystal module is analyzed, and the cycle time of the production line is measured in 24 seconds, and the rate of the production line balance is 60.3%. With the witness software simulation platform used, it is found that the working hours are not high and the proportion of idle time is about 40%. The production process of liquid-crystal module production is analyzed by process analysis. Combining the 5W1H (What, Why, Where, When, Who, How) question technology and ECRS (Eliminate, Combine, Rearrange, Simplify) principle to optimize the production process, the processes cancel 3 times handling, cancel 5 times checks, merge several operations, and reduce the five workers. Finally, simulation model of optimized production line of liquid-crystal module is established, and the simulation results show that the workload for each station basic at 80%, improving the utilization rate of hours. The cycle time of the optimized liquid crystal module production line is 18 seconds. The production line balance rate is 85.56%, increasing by 25%.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Optimizing and Simulating Production Line Balance Based on Human Factors
    Li, Puhong
    Fan, Zhijun
    Zhou, Jun
    Deng, Jianxin
    GREEN POWER, MATERIALS AND MANUFACTURING TECHNOLOGY AND APPLICATIONS II, 2012, 214 : 495 - 499
  • [2] Planning and Optimizing of Assembly Production Line Based on Simulation
    Jia, Chenhui
    Zhang, Shutao
    Xia, Xintao
    MATERIALS PROCESSING TECHNOLOGIES, PTS 1 AND 2, 2011, 154-155 : 1059 - 1063
  • [3] Garment production line balance based on genetic algorithm and simulation
    Huang Z.
    Pikyin M.
    Wen L.
    Fangzhi Xuebao/Journal of Textile Research, 2020, 41 (07): : 154 - 159
  • [4] OPTIMIZATION AND SIMULATION OF GARMENT PRODUCTION LINE BALANCE BASED ON IMPROVED GA
    Jiang, L.
    Duan, J. J.
    Zheng, R. P.
    Shen, H. N.
    Li, H.
    Xu, J.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2023, 22 (02) : 303 - 314
  • [5] Research on assembly line balance based on simulation
    Liu, Wei
    Cai, Jianfeng
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON FINANCIAL INNOVATION AND ECONOMIC DEVELOPMENT (ICFIED 2017), 2017, 34 : 171 - 178
  • [6] Simulation and Optimization of Production Line Based on FlexSim
    Wu, Geng
    Yao, Lin
    Yu, Shaozheng
    PROCEEDINGS OF THE 30TH CHINESE CONTROL AND DECISION CONFERENCE (2018 CCDC), 2018, : 3358 - 3363
  • [7] RESEARCH ON INDUSTRIAL ASSEMBLY LINE BALANCING OPTIMIZATION BASED ON GENETIC ALGORITHM AND WITNESS SIMULATION
    Wang, Y.
    Yang, O.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2017, 16 (02) : 334 - 342
  • [8] The production system optimizing simulation in Petrochemical industry based on HLA
    Dou Zhiwu
    Li Hongwei
    PROCEEDINGS OF THE SECOND INTERNATIONAL SYMPOSIUM ON ELECTRONIC COMMERCE AND SECURITY, VOL I, 2009, : 151 - +
  • [9] OPTIMIZING DRILL TORQUE ON PRODUCTION LINE
    不详
    IEEE SPECTRUM, 1978, 15 (05) : 22 - 22
  • [10] Optimizing and Simulating Production Logistics System of Fluoride Roller Workshop with Witness
    Zhao, J. -Y.
    Cai, Y. -B.
    2011 INTERNATIONAL CONFERENCE ON FUTURE COMPUTER SCIENCE AND APPLICATION (FCSA 2011), VOL 4, 2011, : 37 - 40