Hardware-in-the-loop Relay Testing in Dominion's Blackstart Plan

被引:0
|
作者
Liu, Ren [1 ]
Sun, Rui [2 ]
Tania, Mutmainnia [3 ]
机构
[1] Washington State Univ, Sch Elect Engn & Comp Engn, Pullman, WA 99164 USA
[2] Dominion Virginia Power, Richmond, VA USA
[3] Dominion Integrated Resource Planning, Richmond, VA USA
关键词
Blackstart; RTDS; Hardware-in-the-loop; Relay Testing;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
When a complete or partial blackout has occurred, the system operator is responsible for assessing the system condition, restoring the system based on the emergency operation procedures and re-establishing the integrity of the interconnection. This procedure is called blackstart. During the blackstart process, the system is operating in relatively weak condition, since the generation capacity is small in each blackstart path and there are plenty of different blackstart transients, such as transmission line energization, load pickup, generator synchronization, and island synchronization. All these blackstart transients and possible small fault current may cause the relay protection function to misoperate. In order to validate the relay performance in the Dominions blackstart plan, Real-Time Digital Simulator (RTDS), amplifier, and SEL relay are utilized to perform the hardware-in the-loop real-time relay testing. The QUAD distance protection function and time-inverse overcurrent protection function are tested for both blackstart steady state operation and blackstart switching operation. The possible problems for the relay protection functions during the blackstart process are found from the testing results.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Hardware-in-The-Loop Testing of a Distance Protection Relay
    Camarillo-Penaranda, Juan R.
    Aredes, Mauricio
    Ramos, Gustavo
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2021, 57 (03) : 2326 - 2331
  • [2] Hardware-in-the-loop Testing of Virtual Distance Protection Relay
    Camarillo-Penaranda, Juan R.
    Aredes, Mauricio
    Ramos, Gustavo
    2020 IEEE/IAS 56TH INDUSTRIAL AND COMMERCIAL POWER SYSTEMS TECHNICAL CONFERENCE (I&CPS), 2020,
  • [3] Hardware-in-the-loop Model-based Testing of a Motor Relay with Secondary Injection
    Nino, Carlos
    Pablo Holguin, Juan
    Ramon Camarillo, Juan
    Ramos, Gustavo
    2020 IEEE INDUSTRY APPLICATIONS SOCIETY ANNUAL MEETING, 2020,
  • [4] Hardware-in-the-loop testing for hybrid vehicles
    Dhaliwal, Amanjot
    Nagaraj, Shreyas
    Jogi, Santhosh
    EE: Evaluation Engineering, 2009, 48 (11): : 30 - 34
  • [5] Hardware-in-the-loop testing of CSF shunts
    Manuel Gehlen
    Vartan Kurtcuoglu
    Marianne Schmid Daners
    Fluids and Barriers of the CNS, 12 (Suppl 1)
  • [6] Recent Developments in Hardware-in-the-Loop Testing
    Millitzer, Jonathan
    Mayer, Dirk
    Henke, Christian
    Jersch, Torben
    Tamm, Christoph
    Michael, Jan
    Ranisch, Christopher
    MODEL VALIDATION AND UNCERTAINTY QUANTIFICATION, VOL 3, 2019, : 65 - 73
  • [7] Power System Modeling for Hardware-In-the-Loop Testing of A Traveling-Wave-Based Relay
    Alsharief, Yagoob
    Ijaz, Muhammed
    Haddadi, Aboutaleb
    Xue, Mark
    Kadavil, Rahul
    2023 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES LATIN AMERICA, ISGT-LA, 2023, : 465 - 469
  • [8] A vision for automotive electronics hardware-in-the-loop testing
    Wagner, J
    Brunts, R
    Kaster, K
    Eagan, D
    Anthony, D
    INTERNATIONAL JOURNAL OF VEHICLE DESIGN, 1999, 22 (1-2) : 14 - 28
  • [9] Hardware-in-the-loop testing of an integrated starter generator
    Lucache, Dorin D.
    Horga, Vasile
    Ratoi, Marcel
    Albu, Mihai
    INTERNATIONAL AEGEAN CONFERENCE ON ELECTRICAL MACHINES AND POWER ELECTRONICS & ELECTROMOTION, PROCEEDINGS, 2007, : 363 - 368
  • [10] Power Hardware-in-the-Loop Smart Inverter Testing
    Chang, Hao
    Vanfretti, Luigi
    2024 9TH INTERNATIONAL CONFERENCE ON SMART AND SUSTAINABLE TECHNOLOGIES, SPLITECH 2024, 2024,