A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem

被引:12
|
作者
Shou, Yongyi [1 ]
Xiang, Wenwen [1 ]
Li, Ying [1 ]
Yao, Weijian [1 ]
机构
[1] Zhejiang Univ, Sch Management, Hangzhou 310058, Zhejiang, Peoples R China
基金
中国国家自然科学基金;
关键词
GENETIC ALGORITHM; ALLOCATION; OPTIMIZATION;
D O I
10.1155/2014/302684
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A multiagent evolutionary algorithm is proposed to solve the resource-constrained project portfolio selection and scheduling problem. The proposed algorithm has a dual level structure. In the upper level a set of agents make decisions to select appropriate project portfolios. Each agent selects its project portfolio independently. The neighborhood competition operator and self-learning operator are designed to improve the agent's energy, that is, the portfolio profit. In the lower level the selected projects are scheduled simultaneously and completion times are computed to estimate the expected portfolio profit. A priority rule-based heuristic is used by each agent to solve the multiproject scheduling problem. A set of instances were generated systematically from the widely used Patterson set. Computational experiments confirmed that the proposed evolutionary algorithm is effective for the resourceconstrained project portfolio selection and scheduling problem.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] A hybrid evolutionary algorithm for the resource-constrained project scheduling problem
    Thammano A.
    Phu-ang A.
    Artificial Life and Robotics, 2012, 17 (02) : 312 - 316
  • [2] An evolutionary algorithm for resource-constrained project scheduling
    Hindi, KS
    Yang, HB
    Fleszar, K
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) : 512 - 518
  • [3] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [4] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [5] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [6] Solving resource-constrained project scheduling problem with evolutionary programming
    Sebt, M. H.
    Alipouri, Y.
    Alipouri, Y.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (09) : 1327 - 1335
  • [7] An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags
    Ballestin, Francisco
    Barrios, Agustin
    Valls, Vicente
    JOURNAL OF SCHEDULING, 2011, 14 (04) : 391 - 406
  • [8] An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags
    Francisco Ballestín
    Agustín Barrios
    Vicente Valls
    Journal of Scheduling, 2011, 14 : 391 - 406
  • [9] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time
    Lu Z.-Q.
    Liu X.-Y.
    Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036
  • [10] An efficient simulation algorithm for Resource-Constrained Project Scheduling Problem
    Peng, L.
    Wuliang, P.
    Open Mechanical Engineering Journal, 2014, 8 (01): : 9 - 13