Solving Assembly Scheduling Problems With Tree-Structure Precedence Constraints: A Lagrangian Relaxation Approach

被引:18
|
作者
Xu, Jingyang [1 ]
Nagi, Rakesh [1 ]
机构
[1] SUNY Buffalo, Dept Ind & Syst Engn, Buffalo, NY 14214 USA
关键词
Assembly scheduling; Lagrangian relaxation (LR); makespan; parallel machine scheduling; randomized algorithm; subgradient search; SURROGATE GRADIENT ALGORITHM; RELEASE DATES; SHOP; MINIMIZE; JOBS;
D O I
10.1109/TASE.2013.2259816
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we consider an assembly scheduling problem (ASP) with tree-structured precedence constraints. In our problem, there are a number of work centers. Each work center contains a number of machines of the same functionality. The job to be processed via this system is a job with tree-structure precedence constraints. Each operation in the job has a designated work center. We propose a mixed integer linear programming formulation and solve the problem with a Lagrangian relaxation (LR) approach. We solve the subproblems of the LR problem via a heuristic method and generate feasible solutions via a randomized list scheduling algorithm. Near-optimal results are obtained and the computational time is within a few seconds for problems with size up to 20 machines and 300 operations.
引用
收藏
页码:757 / 771
页数:15
相关论文
共 50 条
  • [1] Scheduling for IC sort and test facilities with precedence constraints via Lagrangian relaxation
    Chen, TR
    Hsia, TC
    JOURNAL OF MANUFACTURING SYSTEMS, 1997, 16 (02) : 117 - 128
  • [2] Solving Steiner Tree Problems in Graphs with Lagrangian Relaxation
    Laura Bahiense
    Francisco Barahona
    Oscar Porto
    Journal of Combinatorial Optimization, 2003, 7 : 259 - 282
  • [3] Solving Steiner tree problems in graphs with Lagrangian relaxation
    Bahiense, L
    Barahona, F
    Porto, O
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2003, 7 (03) : 259 - 282
  • [4] A shuffled cellular evolutionary grey wolf optimizer for flexible job shop scheduling problem with tree-structure job precedence constraints
    Zhu, Zhenwei
    Zhou, Xionghui
    Cao, Diansong
    Li, Ming
    APPLIED SOFT COMPUTING, 2022, 125
  • [5] ON STOCHASTIC SCHEDULING WITH IN-TREE PRECEDENCE CONSTRAINTS
    PAPADIMITRIOU, CH
    TSITSIKLIS, JN
    SIAM JOURNAL ON COMPUTING, 1987, 16 (01) : 1 - 6
  • [6] 2 METHODS OF SOLVING PROBLEMS OF PRECEDENCE CONSTRAINTS
    KOLNIKOVA, Z
    EKONOMICKO-MATEMATICKY OBZOR, 1970, 6 (01): : 56 - 72
  • [7] SCHEDULING PROBLEMS WITH PRECEDENCE CONSTRAINTS: MODELS AND ALGORITHMS
    Montemanni, Roberto
    EUROPEAN SIMULATION AND MODELLING CONFERENCE 2012, 2012, : 5 - 12
  • [8] Shop scheduling problems under precedence constraints
    Strusevich, VA
    ANNALS OF OPERATIONS RESEARCH, 1997, 69 (0) : 351 - 377
  • [9] Shop scheduling problems under precedence constraints
    V.A. Strusevich
    Annals of Operations Research, 1997, 69 : 351 - 377
  • [10] Scheduling multi-product tree-structure pipelines
    MirHassani, S. A.
    Jahromi, H. Fani
    COMPUTERS & CHEMICAL ENGINEERING, 2011, 35 (01) : 165 - 176