Shunting of trains in succeeding yards

被引:13
|
作者
Jaehn, Florian [1 ]
Michaelis, Steffen [1 ]
机构
[1] Univ Augsburg, Sustainable Operat & Logist, Univ Str 16, D-86159 Augsburg, Germany
关键词
Shunting yards; Rail transport; PROGRAMMING FORMULATIONS;
D O I
10.1016/j.cie.2016.10.006
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We consider a problem arising in international rail freight transport. At a shunting yard, inbound trains are taken apart by decoupling freight cars, which are then sent through a system of tracks and switching points to form new outbound trains. Each freight car has a designated outbound train, but each outbound train might consist of freight cars going to different final destinations. Therefore, the outbound trains will be decoupled and rearranged in succeeding shunting yards. If two freight cars with the same final destination end up in an outbound train such that a freight car with a different destination is positioned in-between, additional shunting efforts at succeeding shunting yards are involved. Especially if the succeeding shunting yard is located in a foreign country, the rail company will be charged for every shunting procedure performed by the foreign operator. Therefore, such a situation should be reduced as far as possible. To do so, we may determine the shunting sequence of inbound trains. We will show that this problem is NP-hard and various mixed integer programming models are presented and implemented in CPLEX. Further, a heuristic solution algorithm is suggested. The computation time and the quality of the results are compared to the results of the CPLEX optimizer in a computational study. (C) 2016 Elsevier Ltd. All rights reserved. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1 / 9
页数:9
相关论文
共 50 条
  • [1] k-Shortest routing of trains on shunting yards
    Riezebos, Jan
    van Wezel, Wout
    OR SPECTRUM, 2009, 31 (04) : 745 - 758
  • [2] k-Shortest routing of trains on shunting yards
    Jan Riezebos
    Wout van Wezel
    OR Spectrum, 2009, 31 : 745 - 758
  • [3] SYNCHRONOUS RAILWAY SIMULATION OF SHUNTING YARDS
    Huettler, Benno
    Zazgornik, Jan
    Gronalt, Manfred
    14TH INTERNATIONAL CONFERENCE ON HARBOR, MARITIME AND MULTIMODAL LOGISTICS MODELLING AND SIMULATION (HMS 2012), 2012, : 81 - 84
  • [4] Simulation model for port shunting yards
    Rusca, A.
    Popa, M.
    Rosca, E.
    Rosca, M.
    Dragu, V.
    Rusca, F.
    MODTECH INTERNATIONAL CONFERENCE - MODERN TECHNOLOGIES IN INDUSTRIAL ENGINEERING IV, PTS 1-7, 2016, 145
  • [5] The basic train makeup problem in shunting yards
    Nils Boysen
    Simon Emde
    Malte Fliedner
    OR Spectrum, 2016, 38 : 207 - 233
  • [6] A Framework for Managing Resources at Hump Shunting Yards
    Saeednia, Mahnam
    2020 IEEE 23RD INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2020,
  • [7] Mechatronics in automating shunting processes in marshalling yards
    Jenayeh, I
    Müller, C
    Kositza, N
    Enning, M
    Rake, H
    MECHATRONICS '98, 1998, : 627 - 632
  • [8] The basic train makeup problem in shunting yards
    Boysen, Nils
    Emde, Simon
    Fliedner, Malte
    OR SPECTRUM, 2016, 38 (01) : 207 - 233
  • [9] Shunting Trains with Deep Reinforcement Learning
    Peer, Evertjan
    Menkovski, Vlado
    Zhang, Yingqian
    Lee, Wan-Jui
    2018 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2018, : 3063 - 3068
  • [10] Evaluating operational feasibility before Investing: Shunting yards in Sweden
    Gestrelius, Sara
    ERCIM NEWS, 2016, (105): : 19 - +