共 50 条
- [1] Soil-Bentonite Slurry Trench Cutoff Wall Longevity IFCEE 2018: DEVELOPMENTS IN EARTH RETENTION, SUPPORT SYSTEMS, AND TUNNELING, 2018, (297): : 214 - 223
- [2] Membrane behavior of soil-bentonite slurry-trench cutoff walls SOIL & SEDIMENT CONTAMINATION, 2008, 17 (04): : 316 - 322
- [3] SOIL-BENTONITE SLURRY TRENCH CUTOFFS American Society of Civil Engineers, Journal of the Geotechnical Engineering Division, 1980, 106 (04): : 399 - 417
- [4] SOIL-BENTONITE SLURRY TRENCH CUTOFFS JOURNAL OF THE GEOTECHNICAL ENGINEERING DIVISION-ASCE, 1980, 106 (04): : 399 - 417
- [6] SOIL-BENTONITE SLURRY TRENCH CUTOFFS - DISCUSSION JOURNAL OF THE GEOTECHNICAL ENGINEERING DIVISION-ASCE, 1981, 107 (11): : 1581 - 1583
- [7] COMPATIBILITY OF SOIL-BENTONITE SLURRY WALL BACKFILL MIXTURES WITH CONTAMINATED GROUNDWATER SUPERFUND 89: PROCEEDINGS OF THE 10TH NATIONAL CONFERENCE, 1989, : 519 - 525
- [8] Long-Term Stress and Consolidation Behavior of a Soil-Bentonite Slurry Trench Cutoff Wall GEO-CONGRESS 2024: SOIL IMPROVEMENT, SUSTAINABILITY, GEOENVIRONMENTAL, AND COLD REGIONS ENGINEERING, 2024, 351 : 612 - 620
- [9] Assessment of Backfill Hydraulic Conductivity in an Instrumented Soil-Bentonite Cutoff Wall PROCEEDINGS OF THE 8TH INTERNATIONAL CONGRESS ON ENVIRONMENTAL GEOTECHNICS, VOL 2: TOWARDS A SUSTAINABLE GEOENVIRONMENT, 2019, : 291 - 299