Slurry Discharge Pipeline Damage and Wear Due to Transporting Rock Particles during Slurry Shield Tunneling: A Case Study Based on In Situ Observed Results

被引:2
|
作者
Li, Xinggao [1 ,2 ]
Fang, Yingran [1 ,2 ]
Guo, Yidong [1 ,2 ]
Li, Xingchun [3 ]
机构
[1] Beijing Jiaotong Univ, Key Lab Urban Underground Engn, Educ Minist, Beijing 100044, Peoples R China
[2] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
[3] Wuyi Univ, Fac Intelligent Mfg, Jiangmen 529020, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 12期
基金
美国国家科学基金会;
关键词
slurry discharge pipeline; rock particle; damage and wear; slurry shield tunneling; PRACTICAL ESTIMATION; EROSION DAMAGE; IMPACT; MECHANISMS; PREDICTION; EQUATION;
D O I
10.3390/app13127103
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Rock particles in excavated materials can damage and wear down slurry discharge pipelines when slurry shield tunneling occurs in a pebble layer and rock ground. This pipeline damage and wear, if not properly dealt with, can lead to a broken-down tunneling machine. Based on a slurry shield tunneling project in China, damage and wear were thoroughly examined. The observed pipeline wear and leaks, transported rock particles, mechanical properties, and flow rate of the carrier slurry were presented. The measured results showed that the wear rates of a straight pipe, a pipe along a curved tunnel, a 60 & DEG; inclined pipe, and a 90 & DEG; elbow pipe in pebble ground were approximately 0.71 mm/100 rings, 1 mm/100 rings, 2.14 mm/100 rings, and 4 mm/100 rings, respectively. When the machine drove into rock ground, the wear rates increased by one to two times, which could be attributed to the sharper particle shapes. Countermeasures to address these issues, such as adjusting the pipeline layout, welding reinforcement plates in advance, and preparing additional pipes, were highlighted. The wear rates of different types of pipes, the effectiveness of new pipeline fixing methods, and the probability of pipeline leaks in different strata were discussed in detail.
引用
收藏
页数:20
相关论文
共 2 条
  • [1] Vibration and wear assessment of slurry TBM discharge pipeline transporting large sized rock particles: CFD-DEM-FEM multifield coupled simulation
    Fang, Yingran
    Li, Xinggao
    Guo, Yidong
    Jin, Dalong
    Liu, Hongzhi
    POWDER TECHNOLOGY, 2025, 455
  • [2] Observed uplift behaviors of segmental lining during shield tunneling in hard rock: a case study from Changsha, China
    Wu, Huai-Na
    Xu, Xiao-Peng
    Chen, Ren-Peng
    Liu, Yuan
    Cheng, Hong-Zhan
    Xiao, Chao
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 150