Fuzzy TOPSIS-based risk assessment model for effective nuclear decommissioning risk management

被引:24
|
作者
Awodi, Ngbede Junior [1 ,4 ]
Liu, Yong-kuo [1 ]
Ayo-Imoru, Ronke M. [2 ,4 ]
Ayodeji, Abiodun [3 ,4 ]
机构
[1] Harbin Engn Univ, Fundamental Sci Nucl Safety & Simulat Technol Lab, Harbin 150001, Peoples R China
[2] Univ Johannesburg, Dept Elect Engn Technol, Johannesburg, South Africa
[3] Bangor Univ, Nucl Futures Inst, Bangor LL57, Gwynedd, Wales
[4] Nigeria Atom Energy Commiss, Nucl Power Plant Dev Directorate, Abuja, Nigeria
基金
中国国家自然科学基金;
关键词
Fuzzy modeling; Nuclear decommissioning; Risk assessment; Fuzzy TOPSIS; Risk management; INDUSTRY;
D O I
10.1016/j.pnucene.2022.104524
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The dynamics of the nuclear decommissioning project warrant a critical study of the inherent risks and un-certainties. Previous works have identified several nuclear decommissioning risk factors. However, there is no detailed study that systematically ranks the risk factors to aid risk management decision-making. This work presents a fuzzy-based Technique for Order Preference by Similarities to Ideal Solution (Fuzzy TOPSIS) to evaluate the overall risk factors that may arise in a nuclear decommissioning project. The novel analytic tool presented in this work is used to rank eighteen nuclear decommissioning project risk factors according to their severity, for easy risk management. The evaluation and ranking metrics are the Fuzzy Positive Ideal Solution (FPIS), Fuzzy Negative Ideal Solution (FNIP), and Closeness Coefficient (CC). Feedback from nuclear decom-missioning experts is processed in linguistic terms and converted into fuzzy values to perform the computation of the closeness coefficient rank for each of the risk factors. The ranking shows the effect of each risk factor on project safety, cost overrun, and time delay. The highest ranked risk factors are the structural condition of the facility before decommissioning, the radiological characteristics of the facility before decommissioning, and the established regulation for the disposal of radioactive material, with closeness coefficients of 0.54351, 0.53239, and 0.48637 respectively. The lowest ranked risk factors are the historical documentation, the availability and condition of waste management facility, and increasing public opposition, with closeness coefficients 0.33806, 0.33355, and 0.28917 respectively. The result shows the capability and the importance of the proposed approach for nuclear decommissioning risk assessment, risk management, and optimal decision-making.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] Fermatean fuzzy TOPSIS-based approach for occupational risk assessment in manufacturing
    Gul, Muhammet
    Lo, Huai-Wei
    Yucesan, Melih
    COMPLEX & INTELLIGENT SYSTEMS, 2021, 7 (05) : 2635 - 2653
  • [2] Fermatean fuzzy TOPSIS-based approach for occupational risk assessment in manufacturing
    Muhammet Gul
    Huai-Wei Lo
    Melih Yucesan
    Complex & Intelligent Systems, 2021, 7 : 2635 - 2653
  • [3] Analysis and Ranking of IT Risk Factors Using Fuzzy TOPSIS-Based Approach
    Alshahrani, Haya Mesfer
    Alotaibi, Saud S.
    Ansari, Md Tarique Jamal
    Asiri, Mashael M.
    Agrawal, Alka
    Khan, Raees Ahmad
    Mohsen, Heba
    Hilal, Anwer Mustafa
    APPLIED SCIENCES-BASEL, 2022, 12 (12):
  • [4] Risk Assessment of Safety Management Audit Based on Fuzzy TOPSIS Method
    Tian, Chenning
    Li, Hongxia
    Tian, Shuicheng
    Tian, Fangyuan
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [5] Risk Assessment of Safety Management Audit Based on Fuzzy TOPSIS Method
    Tian, Chenning
    Li, Hongxia
    Tian, Shuicheng
    Tian, Fangyuan
    Li, Hongxia (lihx@xust.edu.cn), 1600, Hindawi Limited (2020):
  • [6] RISK FACTORS SELECTION APPROACH FOR NUCLEAR DECOMMISSIONING RISK ASSESSMENT, MODELING, AND MANAGEMENT
    Awodi, Ngbede Junior
    Liu, Yong-Kuo
    Ayodeji, Abiodun
    Adibeli, Justina Onyinyechukwu
    PROCEEDINGS OF 2021 28TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING (ICONE28), VOL 3, 2021,
  • [7] Entropy-Weighted TOPSIS-Based Bird Strike Risk Assessment for an Airport
    Yu, Changyang
    Zhao, Fan
    Yin, Yu
    Wu, Yi
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2025, 18 (01)
  • [8] A Combined AHP- and TOPSIS-Based Approach in the Assessment of Desertification Disaster Risk
    Pishyar, Sara
    Khosravi, Hassan
    Tavili, Ali
    Malekian, Arash
    Sabourirad, Sima
    ENVIRONMENTAL MODELING & ASSESSMENT, 2020, 25 (02) : 219 - 229
  • [9] A Combined AHP- and TOPSIS-Based Approach in the Assessment of Desertification Disaster Risk
    Sara Pishyar
    Hassan Khosravi
    Ali Tavili
    Arash Malekian
    Sima Sabourirad
    Environmental Modeling & Assessment, 2020, 25 : 219 - 229
  • [10] TOPSIS-based framework for evaluating employee cybersecurity risk
    Kostelic, Katarina
    CROATIAN OPERATIONAL RESEARCH REVIEW, 2025, 16 (01) : 31 - 44