Analytic solution of pull-out failure on bond-slip relationship between deformed rebar and ultra-high-performance concrete

被引:2
|
作者
Liu, Yuming [1 ]
Huang, Yuan [2 ]
机构
[1] Hunan Univ, Coll Civil Engn, Changsha 410082, Peoples R China
[2] Hunan Univ, Coll Civil Engn, Hunan Prov Key Lab Damage Diag Engn Struct, Changsha 410082, Peoples R China
关键词
UHPC; Analytical model; Ultimate bond stress; Bond -slip relationship; FIBER-REINFORCED CONCRETE; STEEL FIBERS; BEHAVIOR; STRENGTH; BARS; STRESS; UHPC;
D O I
10.1016/j.engstruct.2024.117682
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Numerous studies have explored the bond performance between deformed rebar and ultra-high-performance concrete (UHPC), yet an analytical solution to the bond-slip relationship remains elusive. This study presents an analytical solution of pull-out failure for the staged bond-slip constitutive relationship between rebar and UHPC, taking into account the meso-scale bond properties of fibers. The critical point coordinates for different stages are determined by the analytical solution. Utilizing the elastic mechanic solution of thick-walled cylinder under uniform internal pressure, the fictitious crack model, and the fiber-matrix discrete model, analytical solutions and simplified formulas for bond stress and slip at the critical points are provided respectively. The simplified formulas for predicting bond characteristics are proposed. The bond-slip test data are composed of 107 groups from 15 literatures, and the predictions of different formulas are compared. The average ratios of the theoretical ultimate bond stress and peak slip to the test results are 0.995 and 1.033, with a standard deviation of 0.179 and 0.231, and the error is generally within 20%. Compared with the bond-slip relationship, it is more reasonable that the ascending and descending sections are exponential. Moreover, the parameters in the bondslip relationship can be calculated by the theoretical predictions of bond characteristics at each critical point.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Bond-slip relationship between deformed rebar and ultra-high-performance concrete with corrosion effect
    Khaksefidi, Samaneh
    Ghalehnovi, Mansour
    Rahdar, Hosseinali
    CASE STUDIES IN CONSTRUCTION MATERIALS, 2024, 21
  • [2] An Experimental Study on the Bond-Slip Relationship between Rebar and Ultra-High-Performance Concrete Grouted in Bellows
    Wang, Zhongling
    Zheng, Xiaohong
    Wang, Qiqi
    Wang, Qian
    BUILDINGS, 2023, 13 (09)
  • [3] Bond-slip behavior between ultra-high-performance concrete and carbon fiber reinforced polymer bars using a pull-out test and numerical modelling
    Qasem, Altayeb
    Sallam, Yassin S.
    Eldien, Hany Hossam
    Ahangarn, Beta H.
    CONSTRUCTION AND BUILDING MATERIALS, 2020, 260 (260)
  • [4] Refined Peridynamic Modeling of Bond-Slip Behaviors between Ribbed Steel Rebar and Concrete in Pull-Out Tests
    Zhang, Ning
    Gu, Quan
    Wu, Yongzhong
    Xue, Xin
    JOURNAL OF STRUCTURAL ENGINEERING, 2022, 148 (12)
  • [5] Local bond-slip response of GFRP rebar in ultra-high-performance fiber-reinforced concrete
    Yoo, Doo-Yeol
    Kwon, Ki-Yeon
    Park, Jung-Jun
    Yoon, Young-Soo
    COMPOSITE STRUCTURES, 2015, 120 : 53 - 64
  • [6] Bond-Slip Behavior between Deformed Rebar and Concrete at Cryogenic Temperatures
    Zhang, Renbo
    Liu, Kaixin
    Jin, Liu
    Yu, Wenxuan
    Du, Xiuli
    JOURNAL OF MATERIALS IN CIVIL ENGINEERING, 2023, 35 (10)
  • [7] Analytic solution for the bond stress-slip relationship between rebar and concrete
    Gao, Xiangling
    Li, Naikun
    Ren, Xiaodan
    CONSTRUCTION AND BUILDING MATERIALS, 2019, 197 : 385 - 397
  • [8] INVERTIGATION OF BOND-SLIP BEHAVIOR BETWEEN RECYCLED CONCRETE AND STEEL BARS UNDER PULL-OUT TEST
    Bai, Guoliang
    Wu, Shuhai
    Li, Xiaowen
    2ND INTERNATIONAL CONFERENCE ON WASTE ENGINEERING MANAGEMENT, ICWEM 2010, 2010, 73 : 628 - 637
  • [9] Experimental study on bond-slip relationship between corroded rebar and recycled concrete
    Yang, Hai-Feng
    Deng, Zhi-Heng
    Qin, Ying-Hong
    Gongcheng Lixue/Engineering Mechanics, 2015, 32 (10): : 114 - 122
  • [10] Study on bond-slip between reinforcing bar and concrete during transient pull-out test under fire
    Liu, Caiwei
    Qiu, Ziwen
    Wu, Qingdong
    Yan, Liangtai
    Han, Yanqing
    Miao, Jijun
    Ba, Panfeng
    STRUCTURES, 2024, 61