Prioritizing Heritage Building Maintenance: A Fuzzy Model Approach for Arc De Bera, Spain

被引:0
|
作者
Ababneh, Alaa [1 ]
机构
[1] Autonoma Barcelona Univ, Dept Class Archeol, Barcelona, Catalonia, Spain
来源
关键词
Fuzzy Model; Arc De Bera; Art-Risk; 3; 0; Artificial Intelligence; Digital Heritage; Risk Management; CULTURAL-HERITAGE;
D O I
10.5281/zenodo.10442276
中图分类号
K85 [文物考古];
学科分类号
0601 ;
摘要
The "Art-Risk 3.0" research project has developed a new tool to address the challenges faced in maintaining and preserving cultural heritage. This tool aims to evaluate the functional operational age and life cycle of heritage buildings in the Arc de Bera area in Tarragona, Catalonia, Spain, with the goal of promoting preventive conservation through a multidisciplinary approach. The tool considers various factors that contribute to the condition of heritage buildings, including structural stability, material decay, environmental risks, and usage patterns. By employing a fuzzy model, it provides an assessment of the building's condition in historical sites. One of the key features of the Art-Risk tool is its ability to prioritize intervention among different case studies within a specific urban context. It generates three output results: vulnerability, risk, and functionality index. The vulnerability value indicates the level of vulnerability of a building, with lower values suggesting better structural stability and resilience against potential hazards. The risk value signifies the level of risk associated with a building, with lower values indicating a reduced likelihood of damage or deterioration. The functionality index reflects the operational condition and suitability of a building for its intended use, with higher values indicating better functionality and operational performance, by considering these diverse valuations, stakeholders and conservation plan managers can effectively establish priorities for intervention. Buildings with higher vulnerability, risk, or lower functionality index scores are given higher priority for intervention. This approach ensures that limited resources are allocated to the buildings that require immediate attention, maximizing the impact of conservation efforts. Art-Risk 3.0 model incorporates 19 input variables, with five variables automatically assigned based on the building's geographic location. Users are required to provide valid geographical coordinates and the remaining 14 associated values to obtain an accurate assessment of the building's condition.
引用
收藏
页码:58 / 75
页数:18
相关论文
共 41 条
  • [1] Dating of biodeposits of oxalates at the Arc de Bera in Tarragona, Spain
    Girbal, J
    Prada, JL
    Rocabayera, R
    Argemí, M
    RADIOCARBON, 2001, 43 (2B) : 637 - 645
  • [2] Prioritizing Autonomous Maintenance System Attributes using Fuzzy EDAS Approach
    Srivastava, Priyank
    Mustafa, Arsalan
    Khanduja, Dinesh
    Chowdhary, Sunil Kumar
    Kumar, Naveen
    Kartik
    Shukla, Rajendra Kumar
    INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND DATA SCIENCE, 2020, 167 : 1941 - 1949
  • [3] Model for the maintenance-focussed heritage building conservation
    Cruz, Arturo
    Coffey, Vaughan
    Chan, Tommy H. T.
    Perovic, Miljenka
    JOURNAL OF CULTURAL HERITAGE MANAGEMENT AND SUSTAINABLE DEVELOPMENT, 2022, 12 (04) : 309 - 320
  • [4] Maturity model for evaluating building maintenance practice: A fuzzy-DEMATEL approach
    Desbalo, Muluken Tilahun
    Woldesenbet, Asregedew Kassa
    Tafesse, Zewdu Seblework
    Bargstadt, Hans-Joachim
    Yehualaw, Mitiku Damtie
    COGENT ENGINEERING, 2023, 10 (02):
  • [5] Prediction model of the useful life of a heritage building from fuzzy logic
    Macias-Bernal, J. M.
    Calama-Rodriguez, J. M.
    Chavez-de Diego, M. J.
    INFORMES DE LA CONSTRUCCION, 2014, 66 (533)
  • [6] Development of a significant index model for assessing heritage building maintenance management challenges
    Adegoriola, Mayowa I.
    Lai, Joseph H. K.
    Yung, Esther H. K.
    Chan, Edwin H. W.
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (08) : 3398 - 3428
  • [7] A formal approach for graphically building fuzzy XML model
    Yan, Li
    Ma, Zongmin
    INTERNATIONAL JOURNAL OF INTELLIGENT SYSTEMS, 2019, 34 (11) : 3058 - 3076
  • [8] Planning to live longer: A model for the maintenance-focused conservation plan of heritage building
    Cruz, A.
    Coffey, V.
    Chan, T. H. T.
    STRUCTURAL ANALYSIS OF HISTORICAL CONSTRUCTIONS: ANAMNESIS, DIAGNOSIS, THERAPY, CONTROLS, 2016, : 173 - 180
  • [9] Building Wind Farm Maintenance Strategy on an Agents Approach Model
    Kpakpo, Miguel
    Itmi, Mhamed
    Cardon, Alain
    Alexandre, Philippe
    Penin, Carolina
    PROCEEDINGS OF 2017 INTERNATIONAL RENEWABLE & SUSTAINABLE ENERGY CONFERENCE (IRSEC' 17), 2017, : 297 - 303
  • [10] Fuzzy Goal Programming Approach in Selective Maintenance Reliability Model
    Gupta, Neha
    Ali, Irfan
    Bari, Abdul
    PAKISTAN JOURNAL OF STATISTICS AND OPERATION RESEARCH, 2013, 9 (03) : 321 - 331