Project cost and time key factors distressing building construction projects of Sindh Pakistan: a post-pandemic approach

被引:0
|
作者
Shaikh, Haseeb Haleem [1 ]
Zainun, Noor Yasmin [1 ]
Khahro, Shabir Hussain [2 ]
机构
[1] Univ Tun Hussein Onn Malaysia, Fac Civil Engn & Environm Engn, Jamilus Res Ctr, Batu Pahat 86400, Johor, Malaysia
[2] Prince Sultan Univ, Coll Engn, Dept Engn Management, Riyadh 11586, Saudi Arabia
关键词
COVID-19; pandemic; project time; project cost; Sindh building projects; OVERRUN;
D O I
10.24425/ace.2023.147678
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction industry plays a major role in the boost of the country's economy, providing basic facilities for residential and creating thousands of job opportunities. During COVID-19, the construction sectors in Sindh Pakistan was highly suffered and leading to delays in the completion of projects. As the construction sector was globally affected, building construction projects were also affected by completing the projects on estimated time and cost. Thus, this research investigates the significant factors of time and cost that affected the Hyderabad building construction projects during COVID-19 situation. Questionnaire surveys were designed to collect data from the employees working on building projects in Sindh Pakistan. The collected data was analyzed through the Average Index method. Unsafe working environment; shortage of workers; and increasing project cost was observed as significant factors that were highly affected during COVID-19. The results and findings shall be supportive for stakeholders to take into consideration of factors in the early stage of the expected pandemic situation. This research suggested that the stakeholders shall modify or amend the contract clause regarding for pandemic situation and incorporate the identified factors in the contract that should be considered by stakeholders to save the time and cost of the projects.
引用
收藏
页码:591 / 602
页数:12
相关论文
共 3 条
  • [1] Work rate modeling of building construction projects using system dynamic to optimize project cost and time performance
    Rachmawati, Farida
    Mudjahidin, Mudjahidin
    Widowati, Elok Dewi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (02) : 213 - 225
  • [2] Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang
    Haslinda, A. Nor
    Xian, T. Wei
    Norfarahayu, K.
    Hanafi, R. Muhamad
    Fikri, H. Muhammad
    INTERNATIONAL SEMINAR ON MATHEMATICS AND PHYSICS IN SCIENCES AND TECHNOLOGY 2017 (ISMAP 2017), 2018, 995
  • [3] Assessment of Cost Escalation factors for Building and Civil Engineering Projects in Nigerian Construction Industry: a Multiple Regression Approach
    Muhammad, Nasiru Zakari
    Keyvanfar, Ali
    Majid, Muhd Zaimi Abd
    Shafaghat, Arezou
    Magana, Aliyu Muhammad
    Lawan, Hasan
    Balubaid, Saeed
    JURNAL TEKNOLOGI, 2015, 74 (04): : 85 - 91