A dynamic rescheduling and speed management approach for high-speed trains with uncertain time-delay

被引:12
|
作者
Peng, Sairong [1 ,2 ,3 ,4 ]
Yang, Xin [2 ]
Ding, Shuxin [3 ]
Wu, Jianjun [2 ]
Sun, Huijun [2 ]
机构
[1] China Acad Railway Sci Corp Ltd, Signal & Commun Res Inst, Beijing, Peoples R China
[2] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, Beijing, Peoples R China
[3] China Acad Railway Sci Corp Ltd, Ctr Natl Railway Intelligent Transportat Syst Engn, Beijing, Peoples R China
[4] GuangZhou Railway Sci Intelligent Controls Corp Lt, Guangzhou, Peoples R China
基金
中国国家自然科学基金;
关键词
Train rescheduling; Train speed management; Uncertain disruptions; Mixed-integer linear programming; TRAJECTORY OPTIMIZATION; TRAFFIC MANAGEMENT; RAIL NETWORKS; INTEGRATION; RECOVERY;
D O I
10.1016/j.ins.2023.03.003
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper studies the problem of rescheduling trains with speed management in uncertain dis-ruptions that lead to temporary speed restrictions (TSRs) in high-speed railway systems. The disruption uncertainties are that the coverage and speed limit value of TSRs change randomly over time, and the start and end times of TSRs are unknown in advance. First, a mixed-integer linear programming model is formulated to reduce the total train traveling times and improve the passenger comfortability. The solutions of the model provide simultaneously the optimal train rescheduling strategies and train speed control strategies. Second, a rolling horizon algorithm is applied in consideration of the disruption uncertainties. The rolling horizon algorithm updates and solves the model in every time horizon, according to the disruption information newly detected. Therefore, the train rescheduling orders and speed control orders can be adjusted ac-cording to the real-time situation to guarantee effectiveness. The rolling horizon approach is terminated automatically once the disruption ends. Finally, based on the practical data of the Beijing-Tianjin intercity high-speed railway line, numerical experiments are carried out to test the effectiveness and efficiency of the proposed approach.
引用
收藏
页码:201 / 220
页数:20
相关论文
共 50 条
  • [1] Rescheduling Urban Rail Transit Trains to Serve Passengers from Uncertain Delayed High-Speed Railway Trains
    Wang, Wanqi
    Bao, Yun
    Long, Sihui
    SUSTAINABILITY, 2022, 14 (09)
  • [2] Research on Prediction of High-Speed Rail Trains Delay Time
    Shi, Jing
    Peng, Qiyuan
    Liu, Ling
    CICTP 2020: ADVANCED TRANSPORTATION TECHNOLOGIES AND DEVELOPMENT-ENHANCING CONNECTIONS, 2020, : 2129 - 2141
  • [3] TIME-DELAY COMPENSATION FOR HIGH-SPEED DIGITAL PROTECTION
    KUMAR, BSA
    IEEE TRANSACTIONS ON POWER DELIVERY, 1986, 1 (04) : 68 - 73
  • [4] HIGH-SPEED WEAR IN HIGH-SPEED TRAINS
    不详
    NEW SCIENTIST, 1985, 106 (1451) : 25 - 25
  • [5] Dynamic Interaction of Bridges and High-Speed Trains
    Ivanchenko, I. I.
    MECHANICS OF SOLIDS, 2011, 46 (03) : 455 - 466
  • [6] Dynamic interaction of bridges and high-speed trains
    I. I. Ivanchenko
    Mechanics of Solids, 2011, 46 : 455 - 466
  • [7] High-speed trains
    Chigwin, KM
    IEEE SPECTRUM, 2003, 40 (11) : 8 - 8
  • [8] HIGH-SPEED TRAINS
    WHITING, R
    FUTURIST, 1982, 16 (03) : 2 - 2
  • [9] High-Speed Trains
    Glickenstein, Harvey
    IEEE VEHICULAR TECHNOLOGY MAGAZINE, 2009, 4 (04): : 9 - 14
  • [10] Timetable Mapping Model and Dynamic Programming Approach for High-speed Railway Rescheduling
    Xu, Peng
    Feng, Guoqi
    Cui, Dongliang
    Dai, Xuewu
    Zhang, Qi
    Chen, Feng
    PROCEEDINGS OF THE 39TH CHINESE CONTROL CONFERENCE, 2020, : 1739 - 1744