The micro-RWELL detector for the phase-2 upgrade of the LHCb muon system

被引:3
|
作者
Bencivenni, G. [1 ]
De Oliveira, R. [2 ]
Felici, G. [1 ]
Gatta, M. [1 ]
Giovannetti, M. [1 ,3 ]
Morello, G. [1 ]
Lener, M. Poli [1 ]
机构
[1] Lab Nazl Frascati INFN, Frascati, Italy
[2] CERN, Meyrin, Switzerland
[3] INFN Sez Tor Vergata, Rome, Italy
关键词
MPGD; Micro-resistive WELL;
D O I
10.1016/j.nima.2023.168075
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
The micro-RWELL detector (mu-RWELL) is a single amplification stage resistive Micro Pattern Gaseous Detector (MPGD), based on a copper-clad polyimide foil patterned with a micro-well matrix coupled with the readout PCB through a DLC resistive film (10 divided by 100 M omega/). For the phase-2 upgrade of the LHCb experiment, proposed for the LHC Run-5, the excellent performance of the current muon detector will need to be maintained at 40 times the pile-up level experienced during Run-2. Requirements are challenging for the innermost regions of the muon stations: the detectors should exhibit a rate capability up to 1 MHz/cm2 and they are supposed to integrate a charge up to similar to 1 C/cm2. In this framework an intense optimization program of the micro-RWELL technology has been launched in the last year, together with a technology transfer to the industry operating in the PCB field. In order to fulfill the requirements, a new layout of the detector with a very dense current evacuation grid of the DLC has been designed. The detector, co-produced by the CERN-EP-DT-MPT Workshop, lead by one of the authors, and the ELTOS Company, has been characterized in terms of rate capability exploiting a high intensity X-ray Philips 2217/20 gun with a spot size (10 divided by 50 mm diameter) larger than the DLC grounding-pitch. A rate capability exceeding 10 MHz/cm2 has been achieved, in agreement with previous results obtained with m.i.p. at the Paul Scherrer Institute (PSI) in Villigen (CH). A long term stability test is in progress: a charge of about 5 mC/cm2 has been integrated over a period of about 16 days. The test will continue, in harder conditions (larger gain and X-ray flux), with the goal to integrate about 1 C/cm2 in one year, while a slice test of the detector is under preparation.
引用
收藏
页数:3
相关论文
共 50 条
  • [1] The micro-Resistive WELL detector for the phase-2 upgrade of the LHCb muon detector
    Morello, G.
    Bencivenni, G.
    De Oliveira, R.
    Felici, G.
    Gatta, M.
    Lener, M. Poli
    Ochi, A.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2019, 936 : 497 - 498
  • [2] Development of the micro-RWELL discs for the CMD-3 detector
    Fedotovich, G.
    Kudryavtsev, V.
    Shekhtman, L.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2022, 1041
  • [3] The LHCb muon detector at Upgrade II
    Debernardis, Francesco
    NINTH ANNUAL CONFERENCE ON LARGE HADRON COLLIDER PHYSICS, LHCP2021, 2021,
  • [4] The Upgrade II of the LHCb muon detector
    Debernardis, F.
    NUOVO CIMENTO C-COLLOQUIA AND COMMUNICATIONS IN PHYSICS, 2024, 47 (03):
  • [5] Firmware implementation of a displaced muon reconstruction algorithm for the Phase-2 Upgrade of the CMS muon system
    Leguina, P.
    JOURNAL OF INSTRUMENTATION, 2023, 18 (12):
  • [6] The Phase 2 Upgrade of the LHCb Calorimeter system
    Guz, Yu
    JOURNAL OF INSTRUMENTATION, 2020, 15 (09):
  • [7] Electronics integration for the GE2/1 and ME0 GEM detector systems for the CMS phase-2 muon system upgrade
    Butalla, S. D.
    Hohlmann, M.
    JOURNAL OF INSTRUMENTATION, 2022, 17 (05)
  • [8] The nSYNC ASIC for the new readout electronics of the LHCb Muon Detector Upgrade
    Cadeddu, S.
    Casu, L.
    Brundu, D.
    Cardini, A.
    Lai, A.
    Loi, A.
    Albicocco, P.
    Balla, A.
    Carletti, M.
    Ciambrone, P.
    Gatta, M.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2019, 936 : 378 - 379
  • [9] Study of the GEM chamber for the upgrade of the LHCb muon system
    Pinci, D.
    Santimaria, M.
    NUOVO CIMENTO C-COLLOQUIA AND COMMUNICATIONS IN PHYSICS, 2016, 39 (01):
  • [10] Phase I Upgrade of the Readout System of the Vertex Detector at the LHCb Experiment
    Fernandez Prieto, Antonio
    Vazquez Regueiro, Pablo
    Hennessy, Karol
    Buytaert, Jan
    van Beuzekom, Martin
    Lemos Cid, Edgar
    Eklund, Lars
    de Bruyn, Kristof
    Naik, Sneha
    Schiller, Manuel
    Murray, Donal
    Leflat, Alexander
    Boente Garcia, Oscar
    Gallas Torreira, Abraham
    Garcia Plana, Beatriz
    Bowcock, Themis
    Dettori, Francesco
    Dreimanis, Karlis
    Lima, Vinicius Franco
    Hutchcroft, David
    Rinnert, Kurt
    Shears, Tara
    Augusto, Oscar
    Coco, Victor
    Collins, Paula
    Evans, Tim
    Ferro-Luzzi, Massi
    Funk, Wolfgang
    Schindler, Heinrich
    Akiba, Kazu
    Dall'Occo, Elena
    Graz, Cristina Sanchez
    Hulsbergen, Wouter
    Hynds, Daniel
    Kostiuk, Igor
    Merk, Marcel
    Snoch, Aleksandra
    Bobulska, Dana Seman
    Borghi, Silvia
    de Capua, Stefano
    Dutta, Deepanwita
    Gersabeck, Marco
    Parkes, Chris
    Svihra, Peter
    Williams, Mark
    Bogdanova, Galina
    Volkov, Vladimir
    Kopciewicz, Pawel
    Majewski, Maciej
    Oblakowska-Mucha, Agnieszka
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 2020, 67 (04) : 732 - 739