Design summary and construction considerations for the Nagdhunga Tunnel, Nepal

被引:0
|
作者
Tomita, T. [1 ]
Mitsuo, J. [1 ]
Nozue, Y. [2 ]
Asai, R. [2 ]
Shakya, N. M. [3 ]
机构
[1] Eight Japan Engn Consultants Inc, Tokyo, Japan
[2] Nippon Koei Co Ltd, Tokyo, Japan
[3] Govt Nepal, Minist Phys Infrastruct & Transport, Dept Rd, Kathmandu, Nepal
关键词
D O I
10.1201/9781003348030-122
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper describes the Nagdhunga Tunnel project, Nepal's first conventional excavation road tunnel. The tunnel located near the boundary where the Indian Plate subducts into the Eurasian Plate. The geology was complex, with many faults in metamorphic rocks such as phyllite and metamorphic sandstone and alternating permeable and impermeable layers. The design results based on the geological investigation and the current construction status are shown below.
引用
收藏
页码:1021 / 1029
页数:9
相关论文
共 50 条
  • [1] Second Manapouri tailrace tunnel design and construction considerations
    Heer, B
    Essex, R
    Young, D
    1997 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1997, : 3 - 23
  • [2] Shotcrete for tunnel final linings - design and construction considerations
    Gall, V
    Zeidler, K
    Munfah, N
    Cerulli, D
    NORTH AMERICAN TUNNELING 2004, 2004, : 215 - 221
  • [3] Design considerations for construction of the Qinling Tunnel using TBM
    Liu, P
    Liang, WH
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2000, 15 (02) : 139 - 146
  • [4] Geotechnical considerations for design and construction of an immersed tunnel - The Boston's Third Harbour Tunnel
    Chang, CC
    Narasimharajan, S
    Proceedings of the Twelfth Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, Vol 1 and 2, 2003, : 851 - 854
  • [5] Lake Mead Intake No 3 Tunnel – Design considerations and construction experience
    Anagnostou G.
    Schuerch R.
    Perazzelli P.
    2018, Ernst und Sohn (11): : 15 - 23
  • [6] Considerations and strategies behind the design and construction requirements of the Istanbul Strait immersed tunnel
    Ingerslev, LCF
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2005, 20 (06) : 604 - 608
  • [7] TUNNEL DESIGN AND CONSTRUCTION
    CRIGHTON, GS
    BIGGART, AR
    NORIE, EH
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1992, : 18 - 42
  • [8] Design considerations in a long tunnel
    Seifabad, MC
    ROCK MECHANICS IN THE NATIONAL INTEREST, VOLS 1 AND 2, 2001, : 1115 - 1117
  • [9] Design considerations and construction of the Schuman-Josaphat tunnel in the centre of the European district in Brussels
    de Pauw, B.
    Vanderhaeghe, P.
    Hamaide, N.
    Joris, G.
    van Bogaert, Ph.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 893 - 900
  • [10] Design and construction of the Telleda Tunnel
    Fernandez, A.
    Piquer, J.
    Celada, B.
    Roig, E.
    UNDERGROUND WORKS UNDER SPECIAL CONDITIONS, 2007, : 47 - 55