A Comparison of the Project Management Methodologies PRINCE2 and PMBOK in Managing Repetitive Construction Projects

被引:2
|
作者
Simonaitis, Aivaras [1 ]
Dauksys, Mindaugas [1 ]
Mockiene, Jurate [1 ,2 ]
机构
[1] Kaunas Univ Technol, Fac Civil Engn & Architecture, LT-44249 Kaunas, Lithuania
[2] Kaunas Univ Appl Engn Sci, Fac Engn Sci, LT-50155 Kaunas, Lithuania
关键词
project management methodologies; PRINCE2; PMBOK; repetitive construction projects; DESIGN; DELAY; MODEL;
D O I
10.3390/buildings13071796
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Nowadays, companies employ various project management (PM) methodologies to ensure that their projects are effective and successful. It is worth knowing that differences in principles and processes of PM methodologies influence the use of different PMs in managing non-repetitive and repetitive construction projects. This paper presents the selection and application of a rational construction PM methodology to a repetitive construction project after a comparison of two PM methodologies, namely Project Management Body of Knowledge (PMBOK) and Projects IN Controlled Environments (PRINCE2). The object of this study is a repetitive anti-corrosion works project for steel structures conducted at Company X. The research was carried out in two steps. First, a quantitative survey of the respondents from companies involved in the management and execution of construction projects was conducted with the aim to identify a rational approach to construction PM. The questionnaire consisted of fourteen closed-ended questions, six of which were generic and eight were PMBOK- and PRINCE2-specific questions. Companies that took part in the quantitative study identified the PRINCE2 project management approach as the most suitable for managing a repetitive construction project. Using the PRINCE2 PM methodology, the repetitive construction project would aim to provide as much information as possible to the project participants, form a team and assign team leaders responsible for the phases, establish a financial plan, a detailed timetable for the execution of the works, a quality control plan, and a plan of responsible persons, and detail the technological sequencing of the works. Second, a quantitative study on the selection of a rational construction project management approach for a repetitive construction project was pursued, and a qualitative assessment of construction project monitoring trends and actions was conducted. The qualitative research was performed using a structured interview method and asking the representatives of different companies X, Y, and Z the same 15 questions. The results of the qualitative research showed that a successful PM depends on the size of the project team, the PM tools and methodologies used, the PM philosophy, and the frequency of monitoring and discussing the project progress.
引用
收藏
页数:31
相关论文
共 50 条
  • [1] PMBoK vs. PRINCE2 in the context of Polish construction projects: Structural Equation Modelling approach
    Sobieraj, J.
    Metelski, D.
    Nowak, P.
    ARCHIVES OF CIVIL ENGINEERING, 2021, 67 (02) : 551 - 579
  • [2] PRINCE2与PMBOK的异同
    黄绍良
    项目管理技术, 2006, (03) : 41 - 44
  • [3] PROJECT AGILE MANAGEMENT FOR SOFTWARE DEVELOPMENT: A COMPARATIVE STUDY ON THE APPLICABILITY OF SCRUM TOGETHER WITH PMBOK AND / OR PRINCE2
    Vargas, Letcia Marques
    REVISTA DE GESTAO E PROJETOS, 2016, 7 (03): : 48 - 60
  • [4] Project Management Project in Controlled Environment (PRINCE2)
    Hrevus, Jaroslav
    CROATIAN JOURNAL OF EDUCATION-HRVATSKI CASOPIS ZA ODGOJ I OBRAZOVANJE, 2012, 14 : 69 - 75
  • [5] Managing a Software Development Project Complying with PRINCE2 Standard
    Axinte, Sabina-Daniela
    Petrica, Gabriel
    Barbu, Ionut-Daniel
    PROCEEDINGS OF THE 9TH INTERNATIONAL CONFERENCE ON ELECTRONICS, COMPUTERS AND ARTIFICIAL INTELLIGENCE - ECAI 2017, 2017,
  • [6] A Web Based Method for Managing PRINCE2® Projects Using Trello®
    Naik, Nitin
    Jenkins, Paul
    2019 5TH IEEE INTERNATIONAL SYMPOSIUM ON SYSTEMS ENGINEERING (IEEE ISSE 2019), 2019,
  • [7] Position of PRINCE2™ in the world of programme and project management
    Pharro, Richard
    Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 986 - 992
  • [8] The Project Management Maturity Model and Application Based on PRINCE2
    Zhang Lianying
    He Jing
    Zhang Xinxing
    2012 INTERNATIONAL WORKSHOP ON INFORMATION AND ELECTRONICS ENGINEERING, 2012, 29 : 3691 - 3697
  • [9] Project Management and IT Governance. Integrating PRINCE2 and ISO 38500
    de la Camara Delgado, Mercedes
    Saenz Marcilla, Fco Javier
    Calvo-Manzano, Jose A.
    Fernandez Vicente, Eugenio
    7TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI 2012), 2012,
  • [10] Integrating PRINCE2 and ISO/IEC 38500 to project management and governance
    de la Camara Delgado, Mercedes
    Saenz Marcilla, Fco. Javier
    Calvo-Manzano, Jose A.
    Fernandez Vicente, Eugenio
    SISTEMAS Y TECNOLOGIAS DE INFORMACION, VOLS 1 AND 2, 2012, : 360 - +