共 50 条
- [1] Repair crew pre-scheduling and post-disaster dispatch method considering uncertainty of component fault location Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2024, 44 (06): : 161 - 168
- [3] A Robust MPC Method for Post-Disaster Distribution System Reconfiguration based on Repair Crew Routing 2022 17TH INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS (PMAPS), 2022,
- [4] Post-Disaster Dispatch of Transportable Wind Turbines for Enhancing Resilience of Power Distribution Systems 2024 IEEE TEXAS POWER AND ENERGY CONFERENCE, TPEC, 2024, : 566 - 571
- [5] Joint optimization of scheduling and routing in post-disaster road network repair considering multi-crew cooperation Kongzhi yu Juece/Control and Decision, 2024, 39 (12): : 4151 - 4159
- [6] Optimization of Post-disaster Rush Repair Strategy for Distribution Network Considering Network Reconfiguration PROCEEDINGS OF 2019 INTERNATIONAL FORUM ON SMART GRID PROTECTION AND CONTROL (PURPLE MOUNTAIN FORUM), VOL II, 2020, 585 : 813 - 823
- [7] A Dynamic Model of Post-disaster Search and Rescue Considering Information Uncertainty GREEN INTELLIGENT TRANSPORTATION SYSTEMS, 2018, 419 : 597 - 606
- [8] Post-disaster Power System Resilience Enhancement Considering Repair Process 2018 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2018, : 1550 - 1554
- [9] A Sequential Repair Crew Dispatch Strategy for Distribution Systems Coordinated With Transportation Systems IEEE SYSTEMS JOURNAL, 2023, 17 (04): : 5866 - 5876