Characterization of Mechanical Behavior of Ultra-Small Clearance Tunnel Construction in Upper Soil and Lower Rock Composite Strata

被引:2
|
作者
Zhang, Xuemin [1 ]
Fu, Dong [1 ]
Zhou, Xianshun [1 ]
Han, Yuanyuan [2 ]
机构
[1] Cent South Univ, Coll Civil Engn, Changsha 410000, Peoples R China
[2] China Railway No 17 Bur Grp Fifth Engn Co Ltd, Taiyuan 030032, Peoples R China
基金
中国国家自然科学基金;
关键词
tunnel engineering; soil-rock interface; soil stratum; ultra-small clearance tunnel; proximity construction; TWIN TUNNELS;
D O I
10.3390/buildings13020559
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
It is hard to grasp the deformation law of the surrounding rock and the force characteristics of the support structure during the construction of ultra-small clearance tunnels in upper soil and lower rock composite strata. Based on the ultra-small clearance tunnel in Li Shuping, Tongxin Expressway, Guizhou, this paper adopted a combination of numerical simulation and field monitoring to analyze the influence of different burial depths and soil-rock interface positions on the deformation of the surrounding rock and the internal forces of the support structure of the ultra-small clearance tunnel. The conclusions are: (1) the monitoring data show that the stress in the steel frame of the leading tunnel increases first by the influence of proximity construction, and then decreases and reaches a stable value after the secondary lining is applied, and the stress at the arch waist of the soft soil layer furtherest from the side of the middle rock column is greater than that in the rock layer on the side of the middle rock column; (2) the position of the soil-rock interface has a significant influence on the initial support force of the first tunnel, and the bending moment of the structure increases with the downward movement of the soil-rock interface and the increase in the burial depth; (3) the influence of the soil-rock interface position on the initial support moment of the first tunnel is greater than the influence of proximity construction, a point to which attention should be paid during construction; and (4) when the soil-rock interface is located below the foot of the arch, the deformation of the surrounding rock of the following tunnel will be larger than that of the first tunnel. The results can provide a reference for the design and construction of ultra-small clearance tunnels in upper soil and lower rock composite soft strata and soil strata.
引用
收藏
页数:16
相关论文
共 3 条
  • [1] Influence of shield tunnel construction on ground surface settlement under the condition of upper-soft and lower-hard composite strata
    Lv, Jianbing
    Li, Xulong
    Fu, Helin
    Tang, Yong
    Li, Zhanrong
    Zhao, Hui
    JOURNAL OF VIBROENGINEERING, 2020, 22 (05) : 1126 - 1144
  • [2] Safety risk assessment of tunnel construction in upper-soft and lower-hard composite strata based on entropy method and fuzzy evaluation theory
    Wu, Bo
    Chen, Huihao
    Huang, Wei
    Journal of Railway Science and Engineering, 2021, 18 (04) : 1056 - 1063
  • [3] A Novel Method for Analyzing the Factors Influencing Ground Settlement during Shield Tunnel Construction in Upper-Soft and Lower-Hard Fissured Rock Strata considering the Coupled Hydromechanical Properties
    Wang, Yan
    Zhang, Yongjun
    Zhu, Zhen
    Du, Mingqing
    Qi, Yi
    GEOFLUIDS, 2020, 2020