Building Information Modeling in the execution phase of conventional tunneling projects

被引:4
|
作者
Huymajer, Marco [1 ]
Melnyk, Oleksandr [2 ]
Wenighofer, Robert [1 ]
Huemer, Christian [3 ]
Galler, Robert [1 ]
机构
[1] Univ Leoben, Chair Subsurface Engn, Erzherzog Johann Str 3-III, A-8700 Leoben, Austria
[2] TU Wien, Res Unit Construct Proc & Methods, Karls pl 13, A-1040 Vienna, Austria
[3] TU Wien, Res Unit Business Informat, Favoriten str 9, A-1040 Vienna, Austria
关键词
Conventional tunneling; Drill and blast; BIM; IFC; Construction phase; Digitalization; FRAMEWORK;
D O I
10.1016/j.tust.2023.105539
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Building Information Modeling (BIM) has become the key technology for the digital transformation of the architecture, engineering, and construction (AEC) sector. The Industry Foundation Classes (IFC), as an open and vendor-neutral data model, play an essential role in this transformation. Despite all the recent advances of BIM, tunneling needs to catch up with other AEC sectors adopting digital technologies. Currently, IFC is mainly used to capture information directly connected to the structural elements of the final tunnel but rarely as a means to document the tunnel excavation and support. This article proposes an IFC-driven process for the execution phase of conventional tunneling projects by extending the usage of IFC to information about the process, labor, equipment, and employed material. The proposed process is evaluated by a case study demonstrating how to represent data from a conventional tunneling project by IFC. The results show that IFC provides the necessary concepts to express the data of the execution phase of conventional tunneling projects. Implementing an IFC-driven process in this phase significantly contributes to the digital transformation of tunneling projects.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] Building Information Modeling in the execution phase of conventional tunneling projects
    Huymajer, Marco
    Melnyk, Oleksandr
    Wenighofer, Robert
    Huemer, Christian
    Galler, Robert
    Tunnelling and Underground Space Technology, 2024, 146
  • [2] IFC concepts in the execution phase of conventional tunneling projects
    Huymajer, Marco
    Paskaleva, Galina
    Wenighofer, Robert
    Huemer, Christian
    Mazak-Huemer, Alexandra
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 143
  • [3] Building Information Modeling in tunneling - digital design and construction of tunneling projects
    Konig, Markus
    Rahm, Tobias
    Nagel, Felix
    Speier, Ludger
    BAUTECHNIK, 2017, 94 (04) : 227 - 231
  • [4] Building Information Modeling for Transportation Projects
    不详
    BAUINGENIEUR, 2017, 92 : A34 - A34
  • [5] Building Information Modeling Execution Drivers for Sustainable Building Developments
    Famakin, Ibukun O.
    Othman, Idris
    Kineber, Ahmed Farouk
    Oke, Ayodeji Emmanuel
    Olanrewaju, Oludolapo Ibrahim
    Hamed, Mohammed Magdy
    Olayemi, Taiwo Matthew
    SUSTAINABILITY, 2023, 15 (04)
  • [6] A review on the execution method for building information modelling projects in Hong Kong
    Wong, Stella S. Y.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2018, 171 (03) : 100 - 110
  • [7] Diffusion of Building Information Modeling in Building Projects and Firms in Singapore
    Liao, Longhui
    Teo, Evelyn Ai Lin
    Chang, Ruidong
    Zhao, Xianbo
    SUSTAINABILITY, 2020, 12 (18)
  • [8] A Building Information Modeling Approach for Adaptive Reuse Building Projects
    Sanchez, Benjamin
    Bindal-Gutsche, Christoph
    Hartmann, Timo
    Haas, Carl
    CONSTRUCTION RESEARCH CONGRESS 2020: INFRASTRUCTURE SYSTEMS AND SUSTAINABILITY, 2020, : 552 - 561
  • [9] The Role of Building Information Modeling in Offsite Construction Projects
    Meng, Xianhai
    Li, Yongjuan
    Meng, Junyu
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2022, 13 (01)
  • [10] Overview of Building Information Modeling Applications in Construction Projects
    Aboushady, A. M.
    Elbarkouky, M. M. G.
    AEI 2015: BIRTH AND LIFE OF THE INTEGRATED BUILDING, 2015, : 445 - 456