The Critical Risk Factors that Influence Production-oriented Projects in the United Arab Emirates: A 'Best-worst Method' (BWM) Analysis

被引:8
|
作者
Khan, Sharfuddin Ahmed [1 ,2 ]
Ojiako, Udechukwu [3 ,4 ]
Marshall, Alasdair [5 ]
Dalalah, Doraid [2 ,4 ]
Ceylan, Serkan [6 ]
Shabani, Naser Nader Ali [2 ]
Al Sharqawi, Salama Imad [2 ]
机构
[1] Univ Regina, Ind Syst Engn, Regina, SK, Canada
[2] Univ Sharjah, Sharjah, U Arab Emirates
[3] Univ Sharjah, Engn Management, Sharjah, U Arab Emirates
[4] Jordan Univ Sci & Technol, Irbid, Jordan
[5] Univ Southampton, Southampton Business Sch, Risk Management, Southampton, Hants, England
[6] Arden Univ, Sch Project Management, Coventry, W Midlands, England
关键词
Projects; Risk Intelligence; Production; Success Factors; 'Best-Worst Method' (BWM); Levels of Uncertainty; Program & Project Management; Decision Making & Risk Management; MANUFACTURING ORGANIZATIONS; MANAGEMENT; INFORMATION; PERSPECTIVE; PERFORMANCE; INTEGRATION; IDENTIFICATION; UNCERTAINTY; OFFERINGS; FRAMEWORK;
D O I
10.1080/10429247.2022.2041963
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The aim of this paper is to categorize and prioritize the critical risk factors that influence production-oriented projects. Utilizing data obtained from the metal production (manufacturing) and fabrication industry in United Arab Emirates, we employ multicriteria decision analysis encompassing the 'Best-Worst Method' (BWM) for factor ranking and categorization. The outcome of this exercise being the development of substantial proficiency in risk management that will have a significant impact on the overall success of projects commissioned within the production space. Findings drawn against an integrated 'Technology-Organization-Environment' and 'Four levels of uncertainty' framework suggests that 'Automation,' 'Cycle time,' and 'Feed rate' (technological factors), 'Manpower utilization' and 'Agility' (organizational factors), and 'Occupational health and safety' (environmental factors), ranked highest in terms of critical risk factors likely to impact upon the outcome of projects. This paper makes a specific contribution to the literature in that our use of an integrated 'Technology-Organization-Environment' - 'Four levels of uncertainty' framework as a risk intelligence focused typology allows us to focus on proactive as against reactive management of risk. This forms the core element of our theorization of risk knowledge as risk intelligence.
引用
收藏
页码:144 / 160
页数:17
相关论文
共 30 条
  • [1] The relationship between critical success factors and success criteria in construction projects in the United Arab Emirates
    Altarawneh, Jaafer Y.
    Samadi, Behrang
    INTERNATIONAL JOURNAL OF ADVANCED AND APPLIED SCIENCES, 2019, 6 (07): : 43 - 53
  • [2] Assessment and risk mitigation on halal meat supply chain using fuzzy best-worst method (BWM) and risk mitigation number (RMN)
    Masudin, Ilyas
    Zuliana, Putri Elma
    Utama, Dana Marsetiya
    Restuputri, Dian Palupi
    JOURNAL OF ISLAMIC MARKETING, 2024, 15 (03) : 842 - 865
  • [3] An Integrated Approach of Best-Worst Method (BWM) and Triangular Fuzzy Sets for Evaluating Driver Behavior Factors Related to Road Safety
    Moslem, Sarbast
    Gul, Muhammet
    Farooq, Danish
    Celik, Erkan
    Ghorbanzadeh, Omid
    Blaschke, Thomas
    MATHEMATICS, 2020, 8 (03)
  • [4] Energy performance contracting, risk factors, and policy implications: Identification and analysis of risks based on the best-worst network method
    Wang, Zhenfeng
    Xu, Guangyin
    Lin, Ruojue
    Wang, Heng
    Ren, Jingzheng
    ENERGY, 2019, 170 : 1 - 13
  • [5] Prioritization of lower back pain risk factors among industrial workers using the best-worst method
    Khan, Noor Zaman
    Shihab, Suha K.
    Attri, Rajesh
    Siddiquee, Arshad Noor
    Khan, Zahid A.
    INTERNATIONAL JOURNAL OF OCCUPATIONAL SAFETY AND ERGONOMICS, 2021, 27 (02) : 544 - 551
  • [6] Analysis of risk factors affecting traffic accident injury in United Arab Emirates (UAE)
    AlKheder, Sharaf
    AlRukaibi, Fahad
    Aiash, Ahmad
    EUROPEAN JOURNAL OF TRAUMA AND EMERGENCY SURGERY, 2022, 48 (06) : 4823 - 4835
  • [7] Analysis of risk factors affecting traffic accident injury in United Arab Emirates (UAE)
    Sharaf AlKheder
    Fahad AlRukaibi
    Ahmad Aiash
    European Journal of Trauma and Emergency Surgery, 2022, 48 : 4823 - 4835
  • [8] Comprehensive safety assessment of a hydrogen liquefaction system based on an integrated system-theoretic process analysis (STPA) and best-worst method (BWM)
    Wang, Jingjing
    Qi, Meng
    Liu, Shangzhi
    Zhao, Dongfeng
    INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2024, 66 : 479 - 489
  • [9] Groundwater potential assessment based on GIS-based Best-Worst Method (BWM) and Step-Wise Weight Assessment Ratio Analysis (SWARA) Method
    Karakus, Can Bulent
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2023, 30 (11) : 31828 - 31857
  • [10] Risk analysis of electrical power grids in India using best-worst method and grey causal modelling
    Yash, Dhobale
    Rajesh, R.
    BENCHMARKING-AN INTERNATIONAL JOURNAL, 2025, 32 (03) : 838 - 861