Risk response decisions for projects in project portfolios considering objective adjustments and project interdependencies

被引:5
|
作者
Zhang, Xu [1 ]
Goh, Mark [2 ,3 ]
Bai, Sijun [1 ]
Wang, Zonghan [1 ]
机构
[1] Northwestern Polytech Univ, Sch Management, Xian, Peoples R China
[2] Natl Univ Singapore, NUS Business Sch, Singapore, Singapore
[3] Natl Univ Singapore, Logist Inst Asia Pacific, Singapore, Singapore
关键词
Risk response decisions; Project interdependencies; SZFUCOM; QFD; OPTIMIZATION METHOD; FUZZY-QFD; SELECTION; STRATEGIES; MANAGEMENT; SUCCESS; DESIGN; METHODOLOGY; UNCERTAINTY; GOVERNANCE;
D O I
10.1108/K-09-2022-1344
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
PurposeRisk response decisions (RRDs) are vital for project risk mitigation. Although past research has focused on RRDs for independent single projects, it has scarcely explored how to make RRDs for single projects in project portfolios (SPPPs). Consequently, this study aims to bridge the gap in extant literature by developing an integrated approach to select risk response strategies (RRSs) for SPPPs considering objective adjustments and project interdependencies (PIs).Design/methodology/approachAn integrated quality function deployment (QFD) method was used throughout this study. More so, a balanced score card (BSC) and stratified-Z-numbers-full consistency method (SZFUCOM) was applied to identify SPPP success criteria (SP3SC) to determine their weights. In addition, a spherical fuzzy set-design structure matrix (SFDSM) was used to quantify the correlation between the risks and the relationship between the risks and the predecessor projects. Consequently, the relationships between the risks and SP3SC and RRSs were described by the spherical fuzzy set (SFS) and Z-numbers, respectively. Besides, the results are weaved into QFD to transform SP3SC into risks and then into RRSs, while a linear optimization model is used to obtain the optimal RRSs. Lastly, a construction project portfolio (PP) was used to test the veracity of the results to prove their validity.FindingsThe approach to RRDs for single projects is observed to be different from that of SPPPs. In addition, this study finds that project portfolio objective adjustments (PPOAs) and PIs have significant impacts on RRDs given that they influence the risk priorities of independent single projects and SPPPs. Moreover, the application of an integrated QFD effectively synthesized the results from the findings of this study, as well as enabled companies to determine robust RRSs. Finally, the consistency results of the SZFUCOM were better than those of the triangular fuzzy number-full consistency method.Originality/valueThe study innovatively explores the method of RRDs for SPPP, which has been ignored by past research. SP3SC highly compatible with PP success is determined. Z-numbers are first used to evaluate the effect of RRSs to enhance the robustness of RRDs. The study proposes a method of RRDs comprehensively considering PPOAs and PIs, which provides robust methodological guidance for SPPP managers to control risks.
引用
收藏
页码:2217 / 2246
页数:30
相关论文
共 50 条
  • [1] Managing project interdependencies in IT/IS project portfolios: a review of managerial issues
    Bathallath, Sameer
    Smedberg, Asa
    Kjellin, Harald
    IJISPM-INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND PROJECT MANAGEMENT, 2016, 4 (01): : 67 - 82
  • [2] Project Risk Response Decision Making Under Uncertain Project Interdependencies
    Zhang, Xu
    Goh, Mark
    Bai, Sijun
    Wang, Zonghan
    Wang, Qun
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2023, : 7364 - 7378
  • [3] The downside risk of project portfolios: The impact of capital investment projects and the value of project efficiency and project risk management programmes
    Paquin, Jean-Paul
    Gauthier, Celine
    Morin, Pierre-Paul
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (08) : 1460 - 1470
  • [4] Project portfolio risk analysis with the consideration of project interdependencies
    Bai, Libiao
    Shi, Huijing
    Kang, Shuyun
    Zhang, Bingbing
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (02) : 647 - 670
  • [5] The main project complexity factors and their interdependencies in defence projects
    de Rezende, Leandro Bolzan
    Denicol, Juliano
    Blackwell, Paul
    Kimura, Herbert
    PROJECT LEADERSHIP AND SOCIETY, 2022, 3
  • [6] Budget allocation decisions for project risk response
    Zhang, Yao
    Guan, Xin
    KYBERNETES, 2021, 50 (12) : 3201 - 3221
  • [7] Making Project Risk Response Decisions through Stakeholders' Impact on Project Risk Interaction
    Liu, Zhixue
    Ding, Ronggui
    Wang, Lei
    Song, Rui
    Song, Xinyi
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 794 - 804
  • [8] Modeling projects interdependencies to measure their synergic impacts on a project portfolio
    Nabati, Mohammad Mahdi
    Ashrafi, Maryam
    JOURNAL OF PROJECT MANAGEMENT, 2021, 6 (03) : 143 - 156
  • [9] Probabilistic Risk Management in Project Portfolios
    Danielson, Mats
    Ekenberg, Love
    PROCEEDINGS OF THE TWELVETH INTERNATIONAL SYMPOSIUM ON IMPRECISE PROBABILITY: THEORIES AND APPLICATIONS, 2021, 147 : 361 - 364
  • [10] The downside risk of project portfolios: The impact of capital investment projects and the value of project efficiency and project risk management programmes (vol 34, pg 1460, 2016)
    Paquin, Jean-Paul
    Gauthier, Celine
    Morin, Pierre-Paul
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2018, 36 (08) : 1050 - 1053