Model Updating for a Continuous Concrete Girder Bridge Using Data from Construction Monitoring

被引:5
|
作者
Cheng, Xiao-Xiang [1 ]
机构
[1] Southeast Univ, Sch Civil Engn, Nanjing 211189, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 06期
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
finite element model updating; continuous concrete girder bridge; construction monitoring; cantilever casting; stress measurement; uneven temperature; grey theory;
D O I
10.3390/app13063422
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Finite element (FE) model updating can guarantee the accuracy of the numerical analyses for civil structures. However, two deficiencies currently exist with the traditional FE model updating technique based on the measurements of modal parameters and/or the static structural responses of the built structure with respect to its reference information insufficiency and its non-unique solution generally obtained, hampering its extensive use. It becomes the goal of the whole engineering community to introduce new effective methods for the civil structural FE model update. To this end, an innovative FE model updating method using data from construction monitoring is proposed in this article. With regard to its theoretical novelty, the new method transforms the complicated multi-variable optimization mathematical problem with the traditional FE model updating technique into many simple single-variable parameter identification problems. Under the engineering background of Huangsha Harbor Bridge, a three-span concrete continuous box girder bridge constructed utilizing the symmetric cantilever casting method, the effectiveness and the efficiency of the new model updating practice were validated. It is demonstrated using quantitative data that the abundant data measured on Huangsha Harbor Bridge in construction stages can enhance the reference information for the more accurate FE model updating of the structure, and the uncertain parameters with the initial FE model of Huangsha Harbor Bridge can be progressively and easily identified for the proposed model updating method using many single-variable linear regression models, instead of one complicated multi-variable mathematical or numerical model employed by the traditional model updating approaches, which generally leads to non-unique solutions rendered by normal optimization algorithms.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Dynamic finite element model updating of prestressed concrete continuous box-girder bridge
    Lin Xiankun
    Zhang Lingmi
    Guo Qintao
    Zhang Yufeng
    EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION, 2009, 8 (03) : 399 - 407
  • [2] Dynamic finite element model updating of prestressed concrete continuous box-girder bridge
    Lin Xiankun~(1+)
    ++Professor
    §Associate Professor
    *Senior Engineer
    EarthquakeEngineeringandEngineeringVibration, 2009, 8 (03) : 399 - 407
  • [3] Dynamic finite element model updating of prestressed concrete continuous box-girder bridge
    Xiankun Lin
    Lingmi Zhang
    Qintao Guo
    Yufeng Zhang
    Earthquake Engineering and Engineering Vibration, 2009, 8 : 399 - 407
  • [4] Geometry control of long-span continuous girder concrete bridge during construction through finite element model updating
    Wu, Jie
    Yan, Quan-sheng
    Li, Jian
    Hu, Min-yi
    HEALTH MONITORING OF STRUCTURAL AND BIOLOGICAL SYSTEMS 2016, 2016, 9805
  • [5] Analysis and monitoring on jacking construction of continuous box girder bridge
    Li, Fangyuan
    Wu, Peifeng
    Yan, Xinfei
    COMPUTERS AND CONCRETE, 2015, 16 (01): : 49 - 65
  • [6] Finite element model updating of a prestressed concrete box girder bridge using subproblem approximation
    Chen, G. W.
    Omenzetter, P.
    NONDESTRUCTIVE CHARACTERIZATION AND MONITORING OF ADVANCED MATERIALS, AEROSPACE, AND CIVIL INFRASTRUCTURE 2016, 2016, 9804
  • [7] Finite Element Model updating of a prestressed concrete continuous bridge based on dynamic monitoring
    Xue, Gang
    Bai, Weiyu
    Wang, Xian
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 1645 - 1650
  • [8] Application of Displacement Back Analysis in Geometry Monitoring of Segmental Construction of Prestressed Concrete Continuous Girder Bridge
    Sun, Xuexian
    Liu, Zhen
    CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 1082 - 1086
  • [9] Construction monitoring of prestressed concrete continuous beam bridge
    Li, Congqi
    Ge, Wenjie
    Cao, Dafu
    Wang, Biyuan
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 308 - 312
  • [10] DESIGN AND CONSTRUCTION OF A MODEL PRESTRESSED CONCRETE BIFURCATED BOX GIRDER BRIDGE
    PERRY, SH
    WALDRON, P
    PINKNEY, MW
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 2-RESEARCH AND THEORY, 1985, 79 (SEP): : 439 - 454