Mechanical evolution law and deformation characteristics of preliminary lining about newly-built subway tunnel closely undercrossing the existing station: A case study

被引:1
|
作者
Zhang, Huijian [1 ]
Liu, Gongning [1 ]
Liu, Weixiong [1 ]
Zhang, Shuai [1 ]
Chen, Zekun [1 ]
机构
[1] Southwest Jiaotong Univ, Sch Civil Engn, Minist Educ, Key Lab Transportat Tunnel Engn, 111 North Sect,Second Ring Rd, Chengdu 610031, Sichuan, Peoples R China
基金
中国国家自然科学基金;
关键词
deformation law; mechanical behavior; preliminary lining; process correlation; undercrossing; GROUND MOVEMENTS; CONSTRUCTION; SETTLEMENT; BEHAVIOR;
D O I
10.12989/gae.2023.35.5.525
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The development of a city is closely linked to the construction and operation of its subway system. However, constructing a new subway tunnel under an existing station is an extremely complex task, and the deformation characteristics and mechanical behavior of the new subway tunnel during the excavation process can greatly impact the normal operation of the existing station. Although the previous studies about the case of underpass engineering have been carried out, there is limited research on the condition of a newly-built subway tunnel that closely undercrossing an existing station with zero distance between them. Therefore, this study analyzes the deformation law and mechanical behavior characteristics of the preliminary lining of the underpass tunnel during the excavation process based on the real engineering case of Chengdu Metro Line 8. This study also makes an in-depth comparison of the influence of different excavation methods on this issue. Finally, the accuracy of numerical simulation is verified by comparing it with on-site result. The results indicate that the maximum bending moment mainly occurs at the floor slab of the preliminary lining, while that of the ceiling is small. The stress state at the ceiling position is less affected by the construction process of the pilot tunnel. Compared to the all-in-one excavation method, although the process of partial excavation method is more complicated, the deformation of preliminary lining caused by it is basically less than the upper limit value of the standard, while that of the all-in-one excavation method is beyond standard requirements.
引用
收藏
页码:525 / 538
页数:14
相关论文
共 5 条
  • [1] Construction control of a newly-built subway station undercrossing the existing subway tunnel
    Zhang, Chengping
    Zhang, Dingli
    Wu, Jiepu
    Luo, Jianjun
    Zhongguo Tiedao Kexue/China Railway Science, 2009, 30 (01): : 69 - 73
  • [2] Deformation control of a newly-built subway station crossing the adjacent existing subway tunnel
    Chen, Mengqiao
    Yang, Guangwu
    Zhongguo Tiedao Kexue/China Railway Science, 2011, 32 (04): : 53 - 59
  • [3] Deformation and mechanical characteristics of tunnel lining in tunnel intersection between subway station tunnel and construction tunnel
    Li, Yayong
    Jin, Xiaoguang
    Lv, Zhitao
    Dong, Jianghui
    Guo, Jincheng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 56 : 22 - 33
  • [4] Study of Deformation Control and Deformation Law of Existing Tunnel with Parallel Running Underneath Subway Station
    Key Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing
    100044, China
    不详
    100088, China
    不详
    100037, China
    不详
    100037, China
    Tiedao Xuebao, 11 (131-137):
  • [5] Effect of Closely Spaced Twin Tunnel Construction beneath an Existing Subway Station: A Case Study
    Zhang, Xu
    Zhang, Chengping
    Wang, Jianchen
    JOURNAL OF TESTING AND EVALUATION, 2018, 46 (04) : 1559 - 1573