Multi-objective planning for time-cost trade-offs in multi-project parallel environment

被引:0
|
作者
An, Jing [1 ]
Li, Suicheng [1 ]
Wu, Xiao Ping [2 ]
机构
[1] Xian Univ Technol, Sch Econ & Management, Xian, Peoples R China
[2] Xian Univ Posts & Telecommun, Sch Modern Post, Xian, Peoples R China
关键词
Uncertainty theory; Gain coefficient; Multi-objective programming models; Multi-project resource-constrained project scheduling problem; Time-cost trade-off; Human resource optimization;
D O I
10.1108/ECAM-08-2023-0867
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposeProject managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.Design/methodology/approachIt employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.FindingsThe study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.Originality/valueThe research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.
引用
收藏
页数:23
相关论文
共 50 条
  • [1] Optimizing time-cost trade-offs in product development projects with a multi-objective evolutionary algorithm
    Meier, Christoph
    Yassine, Ali A.
    Browning, Tyson R.
    Walter, Ulrich
    RESEARCH IN ENGINEERING DESIGN, 2016, 27 (04) : 347 - 366
  • [2] Time, cost, and quality trade-offs in material requirements planning using fuzzy multi-objective programming
    Bagherpour, M.
    Feylizadeh, M. R.
    Cioffi, D. F.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2012, 226 (B3) : 560 - 564
  • [3] Multi-project Scheduling: Multicriteria Time-cost Trade-off Problem
    Klevanskiy, N. N.
    Tkachev, S. I.
    Voloshchouk, L. A.
    PROCEEDINGS OF THE 13TH INTERNATIONAL SYMPOSIUM INTELLIGENT SYSTEMS 2018 (INTELS'18), 2019, 150 : 237 - 243
  • [4] Optimizing time–cost trade-offs in product development projects with a multi-objective evolutionary algorithm
    Christoph Meier
    Ali A. Yassine
    Tyson R. Browning
    Ulrich Walter
    Research in Engineering Design, 2016, 27 : 347 - 366
  • [5] Recognizing trade-offs in multi-objective land management
    Bradford, John B.
    D'Amato, Anthony W.
    FRONTIERS IN ECOLOGY AND THE ENVIRONMENT, 2012, 10 (04) : 210 - 216
  • [6] Multi-objective trade-offs between cost and reliability in the replacement of water mains
    Dandy, GC
    Engelhardt, MO
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2006, 132 (02) : 79 - 88
  • [7] Fuzzy Multi-objective Programming Application for Time-Cost Trade-off of CPM in Project Management
    Yang, Gino K.
    COMPUTATIONAL COLLECTIVE INTELLIGENCE: TECHNOLOGIES AND APPLICATIONS, PT I, 2010, 6421 : 215 - 229
  • [8] Understanding trade-offs in stellarator design with multi-objective optimization
    Bindel, David
    Landreman, Matt
    Padidar, Misha
    JOURNAL OF PLASMA PHYSICS, 2023, 89 (05)
  • [9] Time-cost trade-offs in overlapped product development
    Roemer, TA
    Ahmadi, R
    Wang, RH
    OPERATIONS RESEARCH, 2000, 48 (06) : 858 - 865
  • [10] OPTIMAL TIME-COST TRADE-OFFS IN GERT NETWORKS
    ARISAWA, S
    ELMAGHRA.SE
    MANAGEMENT SCIENCE SERIES A-THEORY, 1972, 18 (11): : 589 - 599