Stress analysis of full-length grouted bolt under shear deformation of anchor interface (vol 19, pg 3286, 2022)

被引:1
|
作者
Zhu, Zhen-De [1 ]
Shu, Xiao-Yun [1 ,2 ]
Li, Zhe [4 ]
Tian, Hong-Ming [2 ]
Tian, Yun [3 ]
机构
[1] Hohai Univ, Coll Civil & Transportat Engn, Nanjing 210024, Peoples R China
[2] Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn, Wuhan 430071, Peoples R China
[3] Shaoxing Univ, Sch Civil Engn, Shaoxing 312000, Peoples R China
[4] China Railway Design Corp, Tianjin 300251, Peoples R China
关键词
D O I
10.1007/s11629-023-7910-3
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The original online version of this article was revised. The first author is "ZHU Zheng-de" in the original article.The first author's name has been corrected to "ZHU Zhen-de".
引用
收藏
页码:1806 / 1806
页数:1
相关论文
共 24 条
  • [1] Stress analysis of full-length grouted bolt under shear deformation of anchor interface
    Zheng-de Zhu
    Xiao-yun Shu
    Zhe Li
    Hong-ming Tian
    Yun Tian
    Journal of Mountain Science, 2022, 19 : 3286 - 3301
  • [2] Stress analysis of full-length grouted bolt under shear deformation of anchor interface
    Zhu Zheng-de
    Shu Xiao-yun
    Li Zhe
    Tian Hong-ming
    Tian Yun
    JOURNAL OF MOUNTAIN SCIENCE, 2022, 19 (11) : 3286 - 3301
  • [3] Stress analysis of full-length grouted bolt under shear deformation of anchor interface
    ZHU Zheng-de
    SHU Xiao-yun
    LI Zhe
    TIAN Hong-ming
    TIAN Yun
    Journal of Mountain Science, 2022, 19 (11) : 3286 - 3301
  • [4] Erratum to: Stress analysis of full-length grouted bolt under shear deformation of anchor interface
    Zhen-de Zhu
    Xiao-yun Shu
    Zhe Li
    Hong-ming Tian
    Yun Tian
    Journal of Mountain Science, 2023, 20 : 1806 - 1806
  • [5] Characteristic analysis of full-length grouted anchor in slope under free vibration
    School of Civil Engineering and Mechanics, Lanzhou University, Lanzhou
    730000, China
    不详
    730000, China
    不详
    318000, China
    Tumu Gongcheng Xuebao, 11 (111-118):
  • [6] Research and Application of Full-length Grouted Anchor in Roadway under Mining Face
    Zang, Chuanwei
    Ma, Chuanle
    Zhuang, Xuean
    AUTOMATION EQUIPMENT AND SYSTEMS, PTS 1-4, 2012, 468-471 : 2872 - 2877
  • [7] Analysis on The Shear Stress Distribution of Internal Anchorage Section of Full-Length Injected Bolt
    Fan, Junqi
    Dong, Hongxiao
    Ran, Li
    Kong, Fuli
    MODERN TECHNOLOGIES IN MATERIALS, MECHANICS AND INTELLIGENT SYSTEMS, 2014, 1049 : 474 - 478
  • [8] Interface bond degradation and damage characteristics of full-length grouted rock bolt in tunnels with high temperature
    Hu, Yunpeng
    Zheng, Mingming
    Feng, Wenkai
    Tong, Jianjun
    Wang, Yicheng
    Wang, Qiling
    Liu, Kan
    Ye, Longzhen
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2023, 15 (10) : 2639 - 2657
  • [9] Study on the Force Transfer Process of Bolt-Slurry Interface of Full-Length Bonding Anchor System at Earthen Sites
    Wan, Jiaxing
    Wang, Donghua
    Cui, Kai
    COATINGS, 2024, 14 (09)
  • [10] Failure mechanism of full-length grouted bolts for large-deformation tunnels under high geo-stress: A case study
    Wu, Chaoguang
    Zhou, Xianshun
    Wang, Lichuan
    Li, Zikun
    Zhang, Xuemin
    ENGINEERING FAILURE ANALYSIS, 2024, 159