Curved diaphragm wall construction: A case study on the challenges faced

被引:0
|
作者
Lim, K. P. [1 ]
Kaliaperumal, K. [1 ]
Zheng, X. [1 ]
Zheng, Y. [1 ]
机构
[1] Land Transport Author, Singapore, Singapore
关键词
D O I
10.1201/9781003348030-86
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Diaphragm walls are commonly constructed as part of the Earth Retaining Stabilising Structure (ERSS) for deep excavations involving basements, stations and other underground structures. This paper documents the challenges involved during the construction of the curved diaphragm walls due to the varying soil stratigraphy at the Land Transport Authority's (LTA) Contract 883 - Construction of Cantonment Mass Rapid Transit (MRT) Station for Circle Line 6 and analyses the impact of these challenges on quality control. The paper then proposes remedial actions to be taken before and during construction to overcome the challenges through improved planning, which could help to enhance quality and hence improve the construction productivity of curved diaphragm wall construction for future projects in similar soil stratigraphy.
引用
收藏
页码:712 / 719
页数:8
相关论文
共 50 条
  • [1] Construction of an ultra-deep diaphragm wall: a case study
    孙杰
    ZHANG Zi-xin
    黄昕
    JU Xin
    Journal of Chongqing University(English Edition), 2018, 17 (01) : 1 - 16
  • [2] A case study on the blasted trench cut for the construction of diaphragm wall
    Jung, DW
    Jeong, K
    Lee, S
    Cha, ES
    PROCEEDINGS OF THE TWENTY-SIXTH ANNUAL CONFERENCE ON EXPLOSIVES AND BLASTING TECHNIQUE, VOL II, 2000, : 289 - 299
  • [3] DESIGN AND CONSTRUCTION OF THE DIAPHRAGM WALL
    HOWDEN, C
    CRAWLEY, JD
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1995, 108 : 48 - 62
  • [4] DIAPHRAGM WALL CONSTRUCTION TECHNIQUES
    NASH, KL
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1974, 100 (NCO4): : 605 - 620
  • [5] Design and construction of the diaphragm wall
    Howden, C.
    Crawley, J.D.
    Proceedings of the Institution of Civil Engineers: Civil Engineering, 1995, 108 (Suppl): : 48 - 62
  • [6] DIAPHRAGM WALL CONSTRUCTION TECHNIQUES
    LESCIELLOUR, GF
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1975, 101 (03): : 674 - 676
  • [7] Challenges Faced by Agile Testers: A Case Study
    Padmini, K. V. Jeeva
    Kankanamge, P. S.
    Bandara, H. M. N. Dilum
    Perera, G. I. U. S.
    2018 MORATUWA ENGINEERING RESEARCH CONFERENCE (MERCON) 4TH INTERNATIONAL MULTIDISCIPLINARY ENGINEERING RESEARCH CONFERENCE, 2018, : 431 - 436
  • [8] Case history: Southern SeaWater Desalination plant Diaphragm Wall construction
    Webley, G.
    Australian Geomechanics Journal, 2010, 45 (04): : 87 - 92
  • [9] Numerical modelling of diaphragm wall construction
    Kmeid, Maria
    Casaux-Ginestet, Geraldine
    Escadeillas, Gilles
    Armengaud, Julie
    INTERNATIONAL JOURNAL FOR NUMERICAL AND ANALYTICAL METHODS IN GEOMECHANICS, 2024, 48 (09) : 2356 - 2380
  • [10] DIAPHRAGM WALL CONSTRUCTION TECHNIQUES - DISCUSSION
    LITTLE, AL
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1975, 101 (NCO2): : 455 - 456