Design and performance evaluation of thermal energy storage system with hybrid heat sources integrated within a coal-fired power plant

被引:16
|
作者
Miao, Lin [1 ]
Liu, Ming [1 ]
Zhang, Kezhen [2 ]
Yan, Junjie [1 ]
机构
[1] Xi An Jiao Tong Univ, State Key Lab Multiphase Flow Power Engn, Xian 710049, Peoples R China
[2] Xian Thermal Power Res Inst Co Ltd, Xian 710054, Peoples R China
基金
中国国家自然科学基金;
关键词
Coal-fired power plant; Minimum power load; Thermal energy storage; Exergy analysis; Economic analysis; RANKINE-CYCLE; FLEXIBILITY; ELECTRICITY; GENERATION;
D O I
10.1016/j.est.2024.110611
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The operational flexibility of coal-fired power plants (CFPPs) should be effectively enhanced to accommodate large-scale photovoltaic and wind power within the power grid. The integration of thermal energy storage (TES) systems is a potential way to enlarge the load-cycling range of CFPPs. To achieve high operational flexibility of CFPPs and high round-trip efficiency of TES systems, TES systems with hybrid heat sources including the heat converted from power by power-to-heat (P2H) devices and transferred from the reheat steam integrated into CFPP were proposed. Then, simulation and thermo-economic analysis models were developed, and the system design procedure was provided. Results show the minimum power load ratio is decreased from 30 % to about 16 % by storing heat from the reheat steam within the TES system, and then to zero by converting electricity to heat with P2H devices. The mode P-basic constitutes two double-tank molten salt TES systems, which are charged by the heat converted from power by P2H devices and the heat transferred from the reheat steam, respectively. It is discharged by releasing the heat to water/steam cycle of CFPP, and the highest equivalent round-trip efficiency of mode P-basic is up to 62.97 %. Moreover, mode P-basic exhibits the largest total cost of the equipment and storage materials at $58.26 million while it has the largest net present value at $103.79 million and the corresponding payback period is 5 years.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Design and performance evaluation of a new thermal energy storage system integrated within a coal-fired power plant
    Zhang, Kezhen
    Liu, Ming
    Zhao, Yongliang
    Yan, Hui
    Yan, Junjie
    JOURNAL OF ENERGY STORAGE, 2022, 50
  • [2] THERMAL-ECONOMIC FEASIBILITY OF COAL-FIRED POWER PLANT INTEGRATED WITH POWER-TO-HEAT THERMAL ENERGY STORAGE SYSTEM
    Miao, Lin
    Liu, Ming
    Zhang, Kezhen
    Zhao, Yongliang
    Yan, Junjie
    PROCEEDINGS OF ASME POWER APPLIED R&D 2023, POWER2023, 2023,
  • [3] Thermodynamic Analysis on the Coal-Fired Power Plant Integrated With Power-to-Heat Molten Salt Thermal Energy Storage System
    Miao, Lin
    Liu, Ming
    Zhang, Kezhen
    Zhao, Yongliang
    Yan, Junjie
    Kung Cheng Je Wu Li Hsueh Pao/Journal of Engineering Thermophysics, 2023, 44 (11): : 2999 - 3007
  • [4] Performance analysis of a compressed air energy storage system integrated into a coal-fired power plant
    Zhang, Lei
    Cui, Jie
    Zhang, Yanping
    Yang, Tao
    Li, Jianlan
    Gao, Wei
    ENERGY CONVERSION AND MANAGEMENT, 2020, 225
  • [5] Performance analysis of a liquid carbon dioxide energy storage system integrated with a coal-fired power plant
    Hou, Kun
    Wang, Yan
    Han, Ningze
    Ma, Tingshan
    Lv, Kai
    Liu, Xiangyang
    He, Maogang
    JOURNAL OF ENERGY STORAGE, 2024, 77
  • [6] Power increase potential of coal-fired power plant assisted by the heat release of the thermal energy storage system: Restrictions and thermodynamic performance
    Miao, Lin
    Yan, Hui
    Liu, Ming
    ENERGY, 2024, 312
  • [7] Energy, exergy, and economic analyses on coal-fired power plants integrated with the power-to-heat thermal energy storage system
    Miao, Lin
    Liu, Ming
    Zhang, Kezhen
    Zhao, Yongliang
    Yan, Junjie
    ENERGY, 2023, 284
  • [8] Recent Progress on Thermal Energy Storage for Coal-Fired Power Plant
    WANG Wei
    ZHANG Jianyuan
    GU Yi
    LUO Qing
    ZHOU Guiqing
    LI Ang
    LU Guozhong
    MA Tingshan
    ZHAO Yuanzhu
    CHANG Yiming
    XUE Zhaonan
    Journal of Thermal Science, 2024, 33 (06) : 2138 - 2150
  • [9] Recent Progress on Thermal Energy Storage for Coal-Fired Power Plant
    Wang, Wei
    Zhang, Jianyuan
    Gu, Yi
    Luo, Qing
    Zhou, Guiqing
    Li, Ang
    Lu, Guozhong
    Ma, Tingshan
    Zhao, Yuanzhu
    Chang, Yiming
    Xue, Zhaonan
    JOURNAL OF THERMAL SCIENCE, 2024, 33 (06) : 2138 - 2150
  • [10] Performance evaluation of a coal-fired power plant
    Sharma, A.Kr. (avdhesh_sharma35@yahoo.co.in), 1600, RAMS Consultants (09):