Predicting Cost and Schedule Performance of Green Building Projects Based on Preproject Planning Efforts Using Multiple Linear Regression Analysis

被引:3
|
作者
Khun-anod, Kritsada [1 ]
Limsawasd, Charinee [2 ]
Athigakunagorn, Nathee [1 ]
机构
[1] Kasetsart Univ, Fac Engn Kamphaeng Saen, Dept Civil Engn, Nakhon Pathom 73140, Thailand
[2] Chulalongkorn Univ, Fac Engn, Dept Civil Engn, Bangkok 10330, Thailand
关键词
Preproject planning; Cost performance; Schedule performance; Green building projects; Multiple linear regression (MLR); Project definition rating index (PDRI); CONSTRUCTION; CONSUMPTION; IMPACT;
D O I
10.1061/JAEIED.AEENG-1424
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Although the building industry has attempted to adopt the green construction paradigm worldwide, evidence shows that it has not been fully implemented. Consequently, an efficient preplanning tool is pressingly needed to motivate project teams to adopt the green construction concept to increase project success. Other research has focused on essential planning elements that enable projects to achieve green building certification. However, only a few attempts have emphasized cost and schedule performance. This paper developed an efficient-yet-simple predictive model for predicting the project performance (cost and time) of green building construction projects, associated with the effectiveness of preproject planning at the initial stage represented in terms of the Project Definition Rating Index (PDRI). The analysis was conducted in three steps: (1) identifying significant planning elements affecting cost and schedule performance using an independent t-test, (2) constructing predictive models by applying multiple linear regression, and (3) validating the constructed models using a paired sample t-test. Sample data from 17 certified green buildings were utilized. The results identified 10 planning elements that differed significantly between under- and overbudget projects, related to the project requirements, procurement strategy, schedule control, project design, and safety considerations. Similarly, six elements were identified for schedule performance that were classified under the business strategy, economic analysis, and values analysis. Then, predictive models were proposed with coefficients of determination of 0.94 for cost performance and 0.60 for schedule performance. The developed models not only contributed to the preliminary assessment of the possible cost and schedule performance for the current level of a project team's preplanning efforts but also could be further adapted for exploratory evaluation of expected outcomes due to a certain level of improvement in preproject planning.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] PREDICTING THE SCHEDULE AND COST PERFORMANCE IN PUBLIC SCHOOL BUILDING PROJECTS IN TAIWAN
    Juan, Yi-Kai
    Liou, Ling-Er
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (01) : 51 - 67
  • [2] Prediction Analysis for Building Deformation Based on Multiple Linear Regression Model
    Zhang, Bo
    Qiu, Lijun
    Zhou, Zhanxue
    6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [3] Performance Prediction of Spark Based on the Multiple Linear Regression Analysis
    Dong, Lu
    Li, Peng
    Xu, He
    Luo, Baozhou
    Mi, Yu
    PARALLEL ARCHITECTURE, ALGORITHM AND PROGRAMMING, PAAP 2017, 2017, 729 : 70 - 81
  • [4] Hybrid principal component analysis and support vector machine model for predicting the cost performance of commercial building projects using pre-project planning variables
    Son, Hyojoo
    Kim, Changmin
    Kim, Changwan
    AUTOMATION IN CONSTRUCTION, 2012, 27 : 60 - 66
  • [5] An Empirical Investigation of Key Pre-project Planning Practices Affecting the Cost Performance of Green Building Projects
    Son, H.
    Lee, S.
    Kim, C.
    DEFINING THE FUTURE OF SUSTAINABILITY AND RESILIENCE IN DESIGN, ENGINEERING AND CONSTRUCTION, 2015, 118 : 37 - 41
  • [6] Performance measurement of schedule and cost analysis by using earned value management for a residential building
    Sruthi, Mullapudi Durga
    Aravindan, Achuthan
    MATERIALS TODAY-PROCEEDINGS, 2020, 33 : 524 - 532
  • [7] Development of performance-based models for green concrete using multiple linear regression and artificial neural network
    Singh, Priyanka
    Adebanjo, Abiola
    Shafiq, Nasir
    Razak, Siti Nooriza Abd
    Kumar, Vicky
    Farhan, Syed Ahmad
    Adebanjo, Ifeoluwa
    Singh, Archisha
    Dixit, Saurav
    Singh, Subhav
    Sergeevna, Meshcheryakova Tatyana
    INTERNATIONAL JOURNAL OF INTERACTIVE DESIGN AND MANUFACTURING - IJIDEM, 2024, 18 (05): : 2945 - 2956
  • [8] PREDICTING PERFORMANCE IN UK DENTAL STUDENTS USING MULTIPLE-REGRESSION ANALYSIS
    SMITH, BGN
    JOURNAL OF DENTAL RESEARCH, 1975, 54 : L138 - L138
  • [9] Predicting pellet quality using multiple linear regression with Principal Component Analysis (PCA)
    You, Jihao
    Tulpan, Dan
    Ellis, Jennifer L.
    JOURNAL OF ANIMAL SCIENCE, 2024, 102 : 154 - 155
  • [10] Predicting pellet quality using multiple linear regression with Principal Component Analysis (PCA)
    You, Jihao
    Tulpan, Dan
    Ellis, Jennifer L.
    JOURNAL OF ANIMAL SCIENCE, 2024, 102