共 8 条
[3]
Critical Path Segments Scheduling Technique
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2010, 136 (10)
:1078-1085
[5]
Binary Resource Leveling Model: Activity Splitting Allowed[J] . Jaeho Son,Kris G. Mattila.Journal of Construction Engineering and Managemen . 2004 (6)
[6]
Use of genetic algorithms in resource scheduling of construction projects
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2004, 130 (06)
:869-877
[7]
GA-based multicriteria optimal model for construction scheduling
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1999, 125 (06)
:420-427
[8]
Construction resource scheduling with genetic algorithms
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1996, 122 (02)
:125-132

