共 15 条
[1]
National electricity (South Australia)Act 1996. Australia government office. https://w w w.legisla tion.sa.gov.au/LZ/C/A/NATIONAL%20ELECTRICITY%20 (SOUTH%20AUSTRALIA)%20ACT%201996/CURRENT/1996.44.UN.PDF . 2016
[2]
A Flexible Ramping Product: Can It Help Real-Time Dispatch Markets Approach the Stochastic Dispatch Ideal?[J] . Beibei Wang,Benjamin F. Hobbs.  Electric Power Systems Research . 2013
[4]
Wholesale electricity market design with increasing levels of renewable generation, part 1: Revenue sufficiency and long-term reliability[J] . Michael Milligan,Bethany Frew,Aaron Bloom,Erik Ela,Audun Botterud,Aaron Townsend,Todd Levin.  The Electricity Journal . 2016
[5]
Follow the Missing Money: Ensuring Reliability at Least Cost to Consumers in the Transition to a Low-Carbon Power System[J] . Michael Hogan.  The Electricity Journal . 2016
[6]
Flexibility products and markets: Literature review[J] . José Villar,Ricardo Bessa,Manuel Matos.  Electric Power Systems Research . 2018
[8]
When It Comes to Demand Response, Is FERC Its Own Worst Enemy?[J] . James Bushnell,Benjamin F. Hobbs,Frank A. Wolak.  The Electricity Journal . 2009 (8)
[9]
Staff analysis of shortage pricing in RTO and ISO markets. FERC. http://ferc.gov/legal/staff-repo rts/2014/AD14-14-pricing-rto-iso-markets.pdf . 2014
[10]
Methodology for implementing operating reserve demand curve (ORDC)to calculate real-time reserve price adder. ERCOT. http://www.ercot.com/content/meetings/tac/keydocs/2013/1203/12._Methodology_for_Implementin g_Operating_Reserve_Demand_Cu.doc . 2018

