共 5 条
- [1] Dynamic elastoplastic analysis of an over-limit high-rise building in a subway parking lot . Li Junsheng. Science and technology and innovation . 2016
- [2] Current situation and improvement strategies of local staff capacity building in overseas rail transit projects . Zhang Guangfu. China Business Review . 2019
- [3] Discussion on the development and design of the property above the subway vehicle base . Shi Shixi. Railway standard design . 2017
- [4] Experimental Research of Pedestrian Walking Behavior[J] . Winnie Daamen,Serge P. Hoogendoorn. ransportation Research Record . 2003 (1)