Numerical verification of geometry control method of the construction for super-span cable-stayed bridge

被引:0
|
作者
Huang Can1
2. School of Civil Engineering
机构
关键词
cable-stayed bridge; geometry control method; geometric nonlinearity; numerical verification;
D O I
暂无
中图分类号
U448.27 [斜拉桥];
学科分类号
摘要
Taking Sutong Bridge as the object investigated, the correctness of the geometry control method is verified by numerical simulation analysis. Taking the impact of geometric nonlinearity into account, the impacts of structural geometric profile induced by temporary loads and temperature field during the construction procedure are investigated. The simulation results indicate that only the stage state of the structure during construction is affected. Satisfied outcome of construction control can be achieved based on geometry control method.
引用
收藏
页码:57 / 60
页数:4
相关论文
共 50 条
  • [1] Construction and Geometry Control of Incheon Cable-Stayed Bridge
    Yang, Jong-Ho
    Im, Duk-Ki
    Kim, Chang-Hyun
    Ahn, Sang-Sup
    Lee, Wan-Soo
    STRUCTURAL ENGINEERING INTERNATIONAL, 2012, 22 (01) : 49 - 52
  • [2] Accelerated construction and geometry control for cable-stayed bridge using novel cable crane method
    Yu, Xiangmin
    Zhu, Yichen
    Chen, Dewei
    Liu, Jin
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2024,
  • [3] Aerostatic response of a super long span cable-stayed bridge
    Department of Civil Engineering, NERIST, Nirjuli, Itanagar 791 109
    不详
    J Inst Eng India: Civ Eng Div, 2006, NOV. (3-7):
  • [4] Super-long-span bridge with cable-stayed bridge and suspension bridge
    Wang, HJ
    Shioi, Y
    Hasegawa, A
    STRUCTURAL ENGINEERING AND MECHANICS, VOLS 1 AND 2, 1999, : 1589 - 1594
  • [5] Construction Control and Simulation Analysis of Long-Span Cable-stayed Bridge
    Wu, Fangwen
    Xue, Chengfeng
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 816 - +
  • [6] Construction Control Calculation Method for Long-Span Cable-Stayed Bridge Based on Cable Length and Application
    Mei, Xiu-Dao
    Lu, Yi-Yan
    Bridge Construction, 2019, 49 (06) : 42 - 47
  • [7] Construction control of long span steel box girder cable-stayed bridge
    Yue, Qing
    Yan, He-Zhong
    Que, Shui-Jie
    Liu, Hua
    Qin, Zhao-Fu
    Bridge Construction, 2013, 43 (04) : 54 - 60
  • [8] Construction control for the Panyu cable-stayed bridge
    Han, Dajian
    Yan, Quansheng
    Chen, Shuangbi
    Huanan Ligong Daxue Xuebao/Journal of South China University of Technology (Natural Science), 1999, 27 (11): : 1 - 6
  • [9] Construction verification of a cable-stayed arch cooperative bridge in China
    Zhang, Kexin
    Li, Dachao
    Liu, He
    Xue, Xingwei
    Teng, Fei
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-STRUCTURES AND BUILDINGS, 2022, 177 (05) : 371 - 384
  • [10] Prediction of Parameters Error in Method of Construction Control in Cable-Stayed Bridge
    Chen, Changsong
    Yan, Donghuang
    Dong, Daofu
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 2385 - 2389