Dome Combustion Hot Blast Stove for Huge Blast Furnace

被引:0
|
作者
ZHANG Fu-ming
机构
关键词
dome combustion hot blast stove; high blast temperature; ceramic burner; high temperature combustion air preheating; CFD;
D O I
10.13228/j.boyuan.issn1006-706x.2012.09.009
中图分类号
TF578 [热风炉];
学科分类号
摘要
In Shougang Jingtang 5 500m 3 huge blast furnace ( BF ) design , dome combustion hot blast stove ( DCHBS ) technology is developed.DCHBS process is optimized and integrated , and reasonable hot blast stove ( HBS ) technical parameters are determined.Mathematic model is established and adopted by computational fluid dynamics ( CFD ) .The transmission theory is studied for hot blast stove combustion and gas flow , and distribution results of HBS velocity field , CO density field and temperature field are achieved.Physical test model and hot trail unit are established , and the numeral calculation result is verified through test and investigation.3-D simulation design is adopted.HBS process flow and process layout are optimized and designed.Combustion air two-stage high temperature preheating technology is designed and developed.Two sets of small size DCHBSs are adopted to preheat the combustion air to 520-600℃.With the precondition of BF gas combustion , the hot blast stove dome temperature can exceed 1 420 ℃. According to DCHBS technical features , reasonable refractory structure is designed.Effective technical measures are adopted to prevent hot blast stove shell intercrystalline stress corrosion.Hot blast stove hot pipe and lining system are optimized and designed.After blowing in , the blast temperature keeps increasing , and the monthly average blast temperature reaches 1 300℃ when burning single BF gas.
引用
收藏
页码:1 / 7
页数:7
相关论文
共 50 条
  • [1] Dome Combustion Hot Blast Stove for Huge Blast Furnace
    Zhang F.-M.
    Mao Q.-W.
    Mei C.-H.
    Li X.
    Hu Z.-R.
    Journal of Iron and Steel Research International, 2012, 19 (9) : 1 - 7
  • [2] Dome Combustion Hot Blast Stove for Huge Blast Furnace
    Zhang Fu-ming
    Mao Qing-wu
    Mei Cong-hua
    Li Xin
    Hu Zu-rui
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2012, 19 (09) : 1 - 7
  • [3] The effect of blast furnace gas quality and combustion controls on hot blast stove performance
    Cox, Ian J.
    AISE Steel Technology, 2003, 80 (05): : 37 - 41
  • [4] Failure Investigation of a Hot Blast Valve of Stove of Blast Furnace
    Kaushal Kishore
    Sanjay Kushwaha
    Dheeraj Lal
    Ankush Sharma
    Anand Prabhakaran
    Manashi Adhikary
    Anup Kumar
    Journal of Failure Analysis and Prevention, 2021, 21 : 1423 - 1433
  • [5] Failure Investigation of a Hot Blast Valve of Stove of Blast Furnace
    Kishore, Kaushal
    Kushwaha, Sanjay
    Lal, Dheeraj
    Sharma, Ankush
    Prabhakaran, Anand
    Adhikary, Manashi
    Kumar, Anup
    JOURNAL OF FAILURE ANALYSIS AND PREVENTION, 2021, 21 (04) : 1423 - 1433
  • [6] BLAST-FURNACE HOT-BLAST STOVE WITH A CENTRAL COMBUSTION-CHAMBER AND DISTRIBUTED DELIVERY OF BLAST AND REMOVAL OF COMBUSTION PRODUCTS
    SOLOMENTSEV, SL
    STEEL IN THE USSR, 1976, 6 (07): : 360 - 360
  • [7] PERFORMANCE OF BLAST-FURNACE HOT-BLAST STOVE FANS
    LEONIDOV, NK
    KOTOVA, EV
    STAL IN ENGLISH-USSR, 1968, (09): : 720 - &
  • [8] Study and Application of Ceramic Burner of Hot Blast Stove for Blast Furnace
    Dai Fang-qin
    Li Shao-hua
    Liu Ke
    JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL, 2009, 16 : 1002 - 1006
  • [9] MEASUREMENT OF STOVE DOME AND HOT BLAST TEMPERATURES.
    Ulamov, I.M.
    Metallurgist (English Translation of Metallurg), 1973, 17 (5-6): : 412 - 414
  • [10] DIGITAL MODEL OF HOT-BLAST STOVE ASSEMBLY OF A BLAST-FURNACE
    MAKOVSKII, VA
    STEEL IN THE USSR, 1973, 3 (05): : 353 - 355