共 50 条
- [1] OPTIMAL OPERATION OF A HYDROELECTRIC POWER SYSTEM - LONG-TERM AND SHORT-TERM ASPECTS RAIRO-AUTOMATIQUE-SYSTEMS ANALYSIS AND CONTROL, 1981, 15 (03): : 243 - 262
- [2] Joint Optimal Clearing Model of Power Transaction Considering Coupling Security Constraints Under Continuous Operation of Inter-provincial Medium and Long-term Markets Dianwang Jishu/Power System Technology, 2024, 48 (10): : 4135 - 4142
- [3] Long-term optimal operation method of cascaded hydroelectric plants for Songjiang River Inter-Basin Water Diversion System Shuili Xuebao/Journal of Hydraulic Engineering, 2012, 43 (04): : 493 - 501
- [6] Long-Term Scheduling of Provincial Power Grid With Rich Hydropower WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2017: INTERNATIONAL PERSPECTIVES, HISTORY AND HERITAGE, EMERGING TECHNOLOGIES, AND STUDENT PAPERS, 2017, : 476 - 489
- [9] Research on cross-provincial power trading strategy considering the medium and long-term trading plan SCIENTIFIC REPORTS, 2024, 14 (01):
- [10] LONG-TERM, EFFICIENT RICH DETECTOR OPERATION WITH TMAE NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1994, 343 (01): : 250 - 257