共 50 条
- [1] El Carrizo bridge - Cantilever construction of a cable-stayed bridge launching girders deck using HORMIGON Y ACERO, 2015, 66 (275): : 69 - 83
- [2] Study on the seismic retrofit of a steel cable-stayed bridge EARTHQUAKE RESISTANT ENGINEERING STRUCTURES III, 2001, 9 : 641 - 650
- [3] STUDY ON OPTIMAL CONSTRUCTION METHOD FOR LOWER BEAM OF CABLE-STAYED BRIDGE TOWERS INTERNATIONAL SYMPOSIUM ON LIFE-CYCLE PERFORMANCE OF BRIDGES AND STRUCTURES, 2010, : 1032 - 1035
- [5] A Stability Study of the Longest Steel Truss Deck Cable-stayed Bridge during Construction KSCE Journal of Civil Engineering, 2019, 23 : 1717 - 1724
- [7] Prediction of Parameters Error in Method of Construction Control in Cable-Stayed Bridge ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 2385 - 2389
- [8] Incremental Launching Construction Method for Steel Truss Suspension Bridge ADVANCED RESEARCH ON INDUSTRY, INFORMATION SYSTEMS AND MATERIAL ENGINEERING, PTS 1-7, 2011, 204-210 : 842 - 845
- [9] Nondestructive testing method and technique for cable-stayed bridge steel cables ADVANCES IN NONDESTRUCTIVE EVALUATION, PT 1-3, 2004, 270-273 : 1493 - 1499
- [10] Analysis on Vertical Swivel Construction of Cable-Stayed Bridge with Steel Arch Pylon APPLIED MECHANICS AND MATERIALS II, PTS 1 AND 2, 2014, 477-478 : 635 - 639