A simheuristic-based algorithm for the stochastic long-term maintenance scheduling problem

被引:0
|
作者
Coelho, Diego G. [1 ,2 ]
Souza, Marcone J. F. [3 ]
Cota, Luciano P. [2 ]
机构
[1] Univ Fed Ouro Preto, Programa Pos Grad Instrumentacao, Controle & Automacao Proc Min, Campus Univ, BR-35402206 Ouro Preto, MG, Brazil
[2] Inst Tecnol Vale, Campus Univ, BR-35402206 Ouro Preto, MG, Brazil
[3] Univ Fed Ouro Preto, Dept Computacao, Campus Univ, BR-35402136 Ouro Preto, MG, Brazil
关键词
long-term preventive maintenance scheduling; iterated local search; variable neighborhood descent; metaheuristics; dispatching rules; simheuristic;
D O I
10.1111/itor.70021
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This work addresses the problem of assigning preventive maintenance jobs in a 52-week planning horizon. Given a set of machines that need preventive maintenance, a set of maintenance jobs in these machines, a set of work teams, and a planning horizon, the problem consists of assigning each job to a work team in a given instant of the planning horizon, aiming to minimize the cost with work teams and the cost of performing the unscheduled jobs using outsourced teams. We propose an iterated local search (ILS)-based algorithm specialized for this problem. Using real instances, the ILS algorithm achieved the best results in 81% of the instances, outperforming literature algorithms. However, these algorithms only treat the deterministic version of the problem and do not consider the uncertainty in the job duration that may occur in an industry environment. Not considering this aspect can produce an inefficient schedule with many unscheduled jobs. So, this work also proposes a simheuristic-based algorithm (SIM-ILS) capable of capturing this issue. We tested it in three scenarios, which differ in the level of uncertainty regarding the job duration, and compared their results with those provided by the stochastically evaluated ILS solutions. SIM-ILS found the best solution in 61% of the tests. Therefore, the SIM-ILS can be used to support decision-making in different industrial environments, from environments with low variability in job duration to those with high variability.
引用
收藏
页数:29
相关论文
共 50 条
  • [1] Simheuristic algorithm for a stochastic parallel machine scheduling problem with periodic re-planning assessment
    Abu-Marrul, Victor
    Martinelli, Rafael
    Hamacher, Silvio
    Gribkovskaia, Irina
    ANNALS OF OPERATIONS RESEARCH, 2023, 320 (02) : 547 - 572
  • [2] Simheuristic algorithm for a stochastic parallel machine scheduling problem with periodic re-planning assessment
    Victor Abu-Marrul
    Rafael Martinelli
    Silvio Hamacher
    Irina Gribkovskaia
    Annals of Operations Research, 2023, 320 : 547 - 572
  • [3] The long-term hydro-scheduling problem - a new algorithm
    Mantawy, AH
    Soliman, SA
    El-Hawary, ME
    ELECTRIC POWER SYSTEMS RESEARCH, 2003, 64 (01) : 67 - 72
  • [4] Formulations and heuristic for the long-term preventive maintenance order scheduling problem
    de Andrade, Joao Luiz Marques
    Souza, Marcone Jamilson Freitas
    Sa, Elisangela Martins de
    Menezes, Gustavo Campos
    Souza, Sergio Ricardo de
    COMPUTERS & OPERATIONS RESEARCH, 2024, 170
  • [5] Efficient decomposition-based algorithm to solve long-term pipeline scheduling problem
    S.Moradi
    S.A.Mir Hassani
    F.Hooshmand
    Petroleum Science, 2019, (05) : 1159 - 1175
  • [6] Efficient decomposition-based algorithm to solve long-term pipeline scheduling problem
    S.Moradi
    S.A.Mir Hassani
    F.Hooshmand
    Petroleum Science, 2019, 16 (05) : 1159 - 1175
  • [7] Efficient decomposition-based algorithm to solve long-term pipeline scheduling problem
    Moradi, S.
    MirHassani, S. A.
    Hooshmand, F.
    PETROLEUM SCIENCE, 2019, 16 (05) : 1159 - 1175
  • [8] A SIMHEURISTIC ALGORITHM FOR SOLVING AN INTEGRATED RESOURCE ALLOCATION AND SCHEDULING PROBLEM
    Maccarrone, Ludovica
    Giovannelli, Tommaso
    Ferone, Daniele
    Panadero, Javier
    Juan, Angel A.
    2018 WINTER SIMULATION CONFERENCE (WSC), 2018, : 3340 - 3351
  • [9] A simheuristic algorithm for solving the arc routing problem with stochastic demands
    Gonzalez-Martin, Sergio
    Juan, Angel A.
    Riera, Daniel
    Elizondo, Monica G.
    Ramos, Juan J.
    JOURNAL OF SIMULATION, 2018, 12 (01) : 53 - 66
  • [10] A new Tabu Search algorithm for the long-term hydro scheduling problem
    Mantawy, AH
    Soliman, SA
    El-Hawary, ME
    LESCOPE'02: 2002 LARGE ENGINEERINGS SYSTEMS CONFERENCE ON POWER ENGINEERING, CONFERENCE PROCEEDINGS, 2002, : 29 - 34