The Economic Value of Hydrometeorological Information in the Planning of Large-Scale Hydropower System Operations

被引:0
|
作者
Dalcin, Ana Paula [1 ]
Marques, Guilherme Fernandes [1 ]
Espanmanesh, Vahid [2 ]
Quedi, Erik [1 ]
Inada, Marcio Shigueaki [1 ]
Tilmant, Amaury [2 ]
Possantti, Ipora [1 ]
Fan, Fernando Mainardi [1 ]
de Paiva, Rodrigo Cauduro Dias [1 ]
机构
[1] Univ Fed Rio do Grande, Inst Pesquisas Hidraul, BR-91501970 Porto Alegre, RS, Brazil
[2] Univ Laval, Dept Civil & Water Engn, Quebec City, PQ G1V 0A6, Canada
关键词
Weather forecasting; Hydrometeorological data; Hydropower; Reservoir operation; HYDROLOGICAL FORECASTS; OPTIMIZATION; RESERVOIRS;
D O I
10.1061/JWRMD5.WRENG-6591
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study investigated the impact of hydrometeorological data and forecast information availability on improving hydropower production and storage management in reservoir systems, and the associated costs of data production. The methodological approach integrated stochastic optimization and rolling horizon optimization with forecasts to address both short- and long-term operating targets when determining daily reservoir release decisions over the planning horizon. Three hydrometeorological data scenarios were organized to assess the quantitative benefits and to trace the costs, thereby establishing benefit-cost relationships. The large-scale hydropower system in the Paran & aacute; River Basin, Brazil, was used as case study. The results show that improved hydrometeorological data and information allows for better water storage management across time, which increases energy production and value. Up to a 15% increase in hydropower production over a 5-year simulation period was obtained, and the incremental benefits for the modeled system were 2 orders of magnitude greater than the cost of producing the hydrometeorological information. Specifically, every $1 invested in incremental hydrometeorological information generated a return of $775 when subseasonal forecasts replaced stochastic ensembles for reservoir storage management. However, further improvement in the forecast system would be limited to an additional 2.3% maximum gains in energy, indicating decreasing incremental benefits. Finally, the methods and results are helpful to justify resource commitment necessary to data gathering and forecast systems that will allow reservoir and power operations to be continuously improved and adapted in the future.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Optimization of large-scale hydropower system operations
    Barros, MTL
    Tsai, FTC
    Yang, SL
    Lopes, JEG
    Yeh, WWG
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2003, 129 (03) : 178 - 188
  • [2] Large-scale hydropower system optimization
    Barros, MTL
    Lopes, JEG
    Yang, SL
    Yeh, WWG
    INTEGRATED WATER RESOURCES MANAGEMENT, 2001, (272): : 263 - 268
  • [3] Large-scale disassembly operations planning with parallel resources
    Gokgur, Burak
    Gokce, Mahmut Ali
    Ozpeynirci, Selin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (5-8): : 1195 - 1214
  • [4] Large-scale disassembly operations planning with parallel resources
    Burak Gökgür
    Mahmut Ali Gökçe
    Selin Özpeynirci
    The International Journal of Advanced Manufacturing Technology, 2015, 81 : 1195 - 1214
  • [5] Long-Term Optimization of Large-Scale Hydropower System Operations Based on Decomposition-Coordination
    Yan, Zhiyu
    Liao, Shengli
    Cheng, Chuntian
    Zhou, Lingan
    Chen, Fu
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2020, 146 (10)
  • [7] LARGE-SCALE OPERATIONS
    OSTMAN, A
    KEMISK TIDSKRIFT, 1990, 102 (13-14): : 40 - 40
  • [8] A system planning method based on templates for large-scale manufacturing information systems
    Morihisa, H
    Oshita, R
    Furukawa, H
    Kanda, J
    INFORMATION & MANAGEMENT, 1999, 36 (01) : 1 - 7
  • [9] The Value of Subseasonal Hydrometeorological Forecasts to Hydropower Operations: How Much Does Preprocessing Matter?
    Anghileri, D.
    Monhart, S.
    Zhou, C.
    Bogner, K.
    Castelletti, A.
    Burlando, P.
    Zappa, M.
    WATER RESOURCES RESEARCH, 2019, 55 (12) : 10159 - 10178
  • [10] Practical Method for Short-term Operations of Large-scale Hydropower Plants in Power Grids With Rich Hydropower
    Shen J.
    Zhang X.
    Cao R.
    Cheng C.
    Li X.
    Wu Y.
    Zhou B.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2019, 39 (10): : 2816 - 2827