Socioeconomic evaluation of megaprojects: dealing with uncertainties

被引:0
|
作者
Paquet, Nicolas [1 ]
机构
[1] Univ Laval, Fac Adm Sci, Quebec City, PQ, Canada
关键词
D O I
10.1108/IJMPB-12-2024-395
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:923 / 925
页数:3
相关论文
共 50 条
  • [1] Socioeconomic Evaluation of Megaprojects - Dealing With Uncertainties
    Constantin, Marin
    ENERGY RESEARCH & SOCIAL SCIENCE, 2017, 34 : 174 - 175
  • [2] Energy justice issues in renewable energy megaprojects: implications for a socioeconomic evaluation of megaprojects
    Sankaran, Shankar
    Clegg, Stewart
    Muller, Ralf
    Drouin, Nathalie
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2022, 15 (04) : 701 - 718
  • [3] Dealing With Uncertainties
    Abunjaileh, Alaa
    IEEE MICROWAVE MAGAZINE, 2020, 21 (07) : 6 - 6
  • [4] On the Limits of feedback in Dealing with Uncertainties
    Guo, Lei
    PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : XII - XIII
  • [5] DEALING WITH NATURAL-GAS UNCERTAINTIES
    CLEMENTS, J
    GRAEBER, D
    POWER ENGINEERING, 1991, 95 (04) : 37 - 39
  • [6] Dealing With Uncertainties in Software Project Management
    Marinho, Marcelo
    Sampaio, Suzana
    Luna, Alexandre
    Lima, Telma
    Moura, Hermano
    CIT/IUCC/DASC/PICOM 2015 IEEE INTERNATIONAL CONFERENCE ON COMPUTER AND INFORMATION TECHNOLOGY - UBIQUITOUS COMPUTING AND COMMUNICATIONS - DEPENDABLE, AUTONOMIC AND SECURE COMPUTING - PERVASIVE INTELLIGENCE AND COMPUTING, 2015, : 889 - 894
  • [7] WEBROOMING: A WAY OF DEALING WITH UNCERTAINTIES IN PURCHASING
    Kaduskeviciute, Vaida
    Urbonavicius, Sigitas
    MARKET-TRZISTE, 2019, 31 (02): : 139 - 152
  • [8] The importance of dealing with uncertainties in foundation analysis
    Lacasse, S
    GEOTECHNICAL ENGINEERING FOR TRANSPORTATION INFRASTRUCTURE, VOLS 1-3: THEORY AND PRACTICE, PLANNING AND DESIGN, CONSTRUCTION AND MAINTENANCE, 1999, : 385 - 392
  • [9] Wastewater treatment modelling: dealing with uncertainties
    Belia, E.
    Amerlinck, Y.
    Benedetti, L.
    Johnson, B.
    Sin, G.
    Vanrolleghem, P. A.
    Gernaey, K. V.
    Gillot, S.
    Neumann, M. B.
    Rieger, L.
    Shaw, A.
    Villez, K.
    WATER SCIENCE AND TECHNOLOGY, 2009, 60 (08) : 1929 - 1941
  • [10] DEALING WITH UNCERTAINTIES IN INITIAL ORBIT DETERMINATION
    Armellin, Roberto
    Di Lizia, Pierluigi
    Zanetti, Renato
    ASTRODYNAMICS 2015, 2016, 156 : 1085 - 1103