Preventive and proactive planning of PaaS maintenance service teams

被引:0
|
作者
Szwarc, Eryk [1 ]
Bocewicz, Grzegorz [1 ]
Gola, Arkadiusz [2 ]
Wojcik, Robert [3 ]
Banaszak, Zbigniew [1 ]
机构
[1] Koszalin Univ Technol, Fac Elect & Comp Sci, Koszalin, Poland
[2] Lublin Univ Technol, Dept Prod Computerisat & Robotisat, Fac Mech Engn, Lublin, Poland
[3] Wroclaw Univ Sci & Technol, Fac Informat & Commun Technol, Dept Comp Engn, Wroclaw, Poland
来源
IFAC PAPERSONLINE | 2024年 / 58卷 / 19期
关键词
Product-as-a-Service; preventive and proactive planning; vehicle routing; resource allocation; VEHICLE-ROUTING PROBLEM;
D O I
10.1016/j.ifacol.2024.09.205
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper employing the Product-as-a-Service (PaaS) paradigm provides a model integrating preventive and proactive management strategies to maintain the required service level availability in Multi Function Device (MFD) offerings. The problems of resource allocation and servicing problems implied by these strategies focus on planning leasing offers that meet an acceptable failure risk level and routing service teams participating in maintenance missions. The aim is to allocate services that provide balanced risk to suppliers and renters, reduce delays, and prioritize urgent cases by routing a fleet of technical vehicles responsible for delivering and receiving service teams without the constraint of requiring the exact vehicle for both operations. The conducted computer experiments demonstrated the effectiveness of the adopted reference model, allowing for increasing PaaS availability and minimizing service costs. Copyright (C) 2024 The Authors. This is an open access article under the CC BY-NC-ND license (https://creativecommons.org/licenses/by-nc-nd/4.0/)
引用
收藏
页码:778 / 783
页数:6
相关论文
共 50 条
  • [1] Integrated preventive-proactive-reactive offshore wind farms maintenance planning
    Bocewicz, Grzegorz
    Frederiksen, Rasmus Dovnborg
    Nielsen, Peter
    Banaszak, Zbigniew
    ANNALS OF OPERATIONS RESEARCH, 2024,
  • [2] Proactive power monitoring enhances preventive maintenance
    BMI , Santa Clara, United States
    EC and M: Electrical Construction and Maintenance, 1995, 94 (05):
  • [3] THE PREVENTIVE MAINTENANCE PLANNING GUIDE
    BROWN, J
    PLANT ENGINEERING, 1984, 38 (06) : 151 - 153
  • [4] The combined manpower planning and preventive maintenance strategies by aggregate planning for the service division of vending machines
    Kim, S.
    Yoo, S.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2012, 63 (08) : 1034 - 1050
  • [5] Preventative maintenance: A proactive customer service
    Barker, WO
    Lane, JR
    Holbrook, DP
    Vadrevu, NR
    Padalino, LT
    BELL LABS TECHNICAL JOURNAL, 2005, 9 (04) : 187 - 200
  • [6] Planning of Aircraft Fleet Maintenance Teams
    Pereira, Duarte P.
    Gomes, Isaias L. R.
    Melicio, Rui
    Mendes, Victor M. E.
    AEROSPACE, 2021, 8 (05)
  • [7] Optimal planning of unpunctual preventive maintenance
    He, Kai
    Maillart, Lisa M.
    Prokopyev, Oleg A.
    IISE TRANSACTIONS, 2017, 49 (02) : 127 - 143
  • [8] Proactive reliability maintenance: a case study concerning maintenance service costs
    Inacio da Silva, Carlos
    Pereira Cabrita, Carlos
    de Oliveira Matias, Joao
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2008, 14 (04) : 343 - +
  • [9] Multi-objective maintenance planning under preventive maintenance
    Al-Refaie, Abbas
    Almowas, Hiba
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2023, 29 (01) : 50 - 70
  • [10] An integrated production and preventive maintenance planning model
    Aghezzaf, E. H.
    Jamali, M. A.
    Ait-Kadi, D.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (02) : 679 - 685